Skip to main content

Skanska wins E18 section near Oslo

Construction of 660m of the Høvik Tunnel is included in the contract, as well as a cycle path.
By David Arminas June 19, 2023 Read time: 2 mins
Noise barriers on the western approach to the Høvik Tunnel – under construction and just outside Oslo - will have solar panels mounted on them (image courtesy Aas-Jakobsen AS/Statens vegvesen)

Skanska Norway has won a contract to construct 2.3km of the new E18 in Bærum, a municipality in the greater Oslo area.

The deal covers the section between Fornbebukrysset and Strand and will have six lanes, of which one lane in each direction will be reserved for public transport and heavy vehicles. Construction of 660m of the Høvik Tunnel is included in the contract, as well as a cycle path.

The existing E18 in the area carries around 90,000 vehicles daily.

Under a different contract, construction of the Høvik Tunnel started in January. Most of the tunnel – around 1.75km – will run though rock and Skanska will be constructing in concrete an extension to the structure.

According to the Norwegian Public Roads Administration, Statens vegvesen, when the Høvik Tunnel is completed in a few years' time, the tunnel portal from the west will be illuminated using power from solar cells that will be situated on 7m-high noise barriers running along the E18.

However, the agency said installation of both noise barriers and solar panels is a few years down the road. The plan is for the barriers to be in place at Ramstadsletta in 2026/27. The barriers will have a curvature favourable for exposing the solar panels to the sun and cover an area between 250-300m² on the south side of the road, just before the planned Ramstadsletta Bridge. With today's technology, this gives a power production of at least 50kW.

Some attempts have previously been made to use solar cells for tunnel lighting in smaller single-pass tunnels. But the E18 West Corridor is the first to test it on a highly traffic road.

For more information on companies in this article

Related Content

  • Norwegian tunnel project being delayed
    April 2, 2020
    A Norwegian tunnel project is now being delayed.
  • Italian highway deals moving ahead
    January 21, 2022
    Important Italian highway deals are moving ahead.
  • Volvo wins on aggregate
    December 3, 2013
    In the Canadian city of Coquitlam, 3,628tonnes of glacial clay is being excavated every day across a 90hectare aggregate open-pit mine. LaFarge in North America is the largest diversified supplier of construction materials in the United States and Canada. For the last decade the company has used Greater Vancouver-based contractor, Vertex Excavating, to work across its 90hectare aggregate open-pit mine, exposing and transporting some of the best concrete aggregate material available on the market. Th
  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop