Skip to main content

Shortlist set for Norway’s Sotra PPP project

Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.
By David Arminas May 21, 2020 Read time: 2 mins
The proposed four-lane Sotra Connection linking Bergen to Sotra island (photo Statens Vegvesen)

Norway has shortlisted three consortia – Sotra Link, Itias and Vis Sotra – for the US$1.15 billion Sotra tunnel and bridge project in the county of Hordaland.

Sotra Link comprises Spain’s FCC Construcción, Italy’s Webuild (formerly Salini Impregilo), SK Engineering from South Korea and Macquarie Corporate Holdings.

Itias includes Italian contractor Itinera and also its parent company Italian toll road operator ASTM as well as IHI from Japan.

Via Sotra is composed of France’s Vinci Concessions, Vinci Highways, Spain’s Acciona Concesiones, and Implenia Switzerland.

Final choice for the €900 million public-private project, a 25-year finance, build and operate contract, will be made by the end of the year, according to the state road authority Statens Vegvesen. Work will start in early 2021 on the project, officially called the National Road 555 Sotra Connection.

The proposed four-lane Sotra suspension bridge is 29.5m wide and has a 592m main span with the two towers rising 144m above sea level. A separate pedestrian path and separate cycle lane, both 5m wide, were part of the design.

The project overall has 19 other smaller bridges, 11 overpasses/underpasses and 21 tunnel portals. Around 11 tunnels through the mountains were envisaged, from 1-2km longs. Around 24km of access roads are scheduled with nearly 14km of bicycle and pedestrian paths, around 3m wide.

The new bridge is to be built parallel to the existing two-lane 1.2km concrete suspension Sotra Bridge that opened in 1971. It carries around 22,700 daily, estimated to rise to 26,000 by 2024. It crosses Knarreviksundet (Knarrevik Sound) that separates the island of Litlesotra, part of the Sotra archipelago, from the mainland and the city Bergen.

A new bridge is needed because, according to Statens Vegvesen, over the past 15 years there has been a strong increase in traffic between Sotra and Bergen. But old bridge is vulnerable to high winds and is closed when wind speed exceeds 30m/sec.

A tender planned for early last year was cancelled because of geological issues near Lake Storavatnet, noted Jon Georg Dale, minister of transport, at the time. Also, reconstruction of a high-voltage power cable had come under question.

For more information on companies in this article

Related Content

  • Major bridge widening project going to plan
    May 2, 2012
    When built it was determined that a vital US road/rail bridge would always be widened.
  • EU funding tunnel safety investment for Maastricht
    January 21, 2013
    The new urban tunnel project under construction at Maastricht in the Netherlands will benefit from EU for key safety features. The European Union will provide co-financing of €5 million from the TEN-T Programme to install safety provisions for the on-going implementation of Maastricht’s E25/A2 urban highway tunnel. The work will help ensure the link features high standards of tunnel safety and security and meets the EU’s tough legislation. The project was selected for funding under the 2011 TEN-T Annual Cal
  • US$2.1 billion Louisiana bridge deal for partners
    February 2, 2024
    A US$2.1 billion Louisiana bridge deal has been won by Sacyr, Acciona and Plenary Americas.
  • Bidding strong for Slovenia tunnel project
    March 26, 2018
    Bidding is strong for a project to build the new Karavanke tunnel in Slovenia, with the award due soon and construction expected to commence in 2018. So far nine bids have been received for the link, which lies close to Slovenia’s border with Austria. A bid of €89.3 million has been made by the Turkish contractor Cengiz Insaat, while at the other end of the scale a bid of €140 million has come from a partnership of Slovenian firm Pomgrad and Swiss company Marti. A partnership comprising Implenia Österreich