Skip to main content

Shortlist set for Norway’s Sotra PPP project

Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.
By David Arminas May 21, 2020 Read time: 2 mins
The proposed four-lane Sotra Connection linking Bergen to Sotra island (photo Statens Vegvesen)

Norway has shortlisted three consortia – Sotra Link, Itias and Vis Sotra – for the US$1.15 billion Sotra tunnel and bridge project in the county of Hordaland.

Sotra Link comprises Spain’s FCC Construcción, Italy’s Webuild (formerly Salini Impregilo), SK Engineering from South Korea and Macquarie Corporate Holdings.

Itias includes Italian contractor Itinera and also its parent company Italian toll road operator ASTM as well as IHI from Japan.

Via Sotra is composed of France’s Vinci Concessions, Vinci Highways, Spain’s Acciona Concesiones, and Implenia Switzerland.

Final choice for the €900 million public-private project, a 25-year finance, build and operate contract, will be made by the end of the year, according to the state road authority Statens Vegvesen. Work will start in early 2021 on the project, officially called the National Road 555 Sotra Connection.

The proposed four-lane Sotra suspension bridge is 29.5m wide and has a 592m main span with the two towers rising 144m above sea level. A separate pedestrian path and separate cycle lane, both 5m wide, were part of the design.

The project overall has 19 other smaller bridges, 11 overpasses/underpasses and 21 tunnel portals. Around 11 tunnels through the mountains were envisaged, from 1-2km longs. Around 24km of access roads are scheduled with nearly 14km of bicycle and pedestrian paths, around 3m wide.

The new bridge is to be built parallel to the existing two-lane 1.2km concrete suspension Sotra Bridge that opened in 1971. It carries around 22,700 daily, estimated to rise to 26,000 by 2024. It crosses Knarreviksundet (Knarrevik Sound) that separates the island of Litlesotra, part of the Sotra archipelago, from the mainland and the city Bergen.

A new bridge is needed because, according to Statens Vegvesen, over the past 15 years there has been a strong increase in traffic between Sotra and Bergen. But old bridge is vulnerable to high winds and is closed when wind speed exceeds 30m/sec.

A tender planned for early last year was cancelled because of geological issues near Lake Storavatnet, noted Jon Georg Dale, minister of transport, at the time. Also, reconstruction of a high-voltage power cable had come under question.

For more information on companies in this article

Related Content

  • Highway widening for key highway in Nigeria
    January 26, 2015
    A highway widening project in Nigeria will improve the connection between the city of Minna and the capital, Abuja. The road being widened connects Suleja, which lies close to Abuja, with Minna and the work is being carried out on a 41km section of the route. The work will be carried out by Italian contractor Salini Impregilo and involves adding a second lane to the route, while the project is worth some US$127 million. The 48 month project was awarded by the Nigerian Ministry of Public Works.
  • Tunnelling underway for new London link
    September 9, 2022
    Tunnelling is underway for a new London road link.
  • Colombia key tunnel project – new completion date
    March 6, 2019
    A new completion date has been set for the La Linea Tunnel project in Colombia. The work should now be finished in late 2020, although the project was originally intended to be ready by late 2016. The various contracts to complete the Cruce de la Cordillera Central route will be awarded in April 2019 by the national road institute (Invias). The contracts will include strict measures to ensure that contractors will comply with all the terms of the deal. The Colombian Government previously allotted US$204.5 m
  • Flatiron wins Steveston work in Canada
    April 18, 2022
    The Steveston Interchange project near Vancouver is key for improving traffic flow into what will be a new immersed Massey Tunnel under the Fraser River.