Skip to main content

Remote working for Avery Dennison on the island of St. Helena

Constructing the airport on the remote island of St. Helena has been one of the largest projects for a South African construction group. It’s the site of one of Avery Dennison Refiective Solutions most remote traffic sign projects. The 121km² island is a British Overseas Territory in the southern Atlantic Ocean, just under 2,000km from Angola on Africa’s southwest coast and 4,000km from Rio de Janeiro on Brazil’s east coast. St Helena is noted for being where French Emporer Napoleon was exiled in 1815 af
March 22, 2017 Read time: 2 mins
Constructing the airport on the remote island of St. Helena has been one of the largest projects for a South African construction group. It’s the site of one of 1540 Avery Dennison Refiective Solutions most remote traffic sign projects.

The 121km² island is a British Overseas Territory in the southern Atlantic Ocean, just under 2,000km from Angola on Africa’s southwest coast and 4,000km from Rio de Janeiro on Brazil’s east coast. St Helena is noted for being where French Emporer Napoleon was exiled in 1815 after his defeat at the Battle of Waterloo. He died there in 1821.

Today, the island’s population of just over 4,500 is hoping that the new airport – when opened - will boost tourism to make the island self-sufficient. To replace the five-day boat trip from Africa, the UK government ploughed upwards of US$346 million to build the airport which has yet to open because of remaining concerns about wind shear affecting landing aircraft.

However, the road infrastructure for the design-build-operate airport project is in place, thanks to work by Basil Read. Deon De Jager, Basil Read’s director for St Helena, contracted Repro Signs, a South African traffic sign fabricator, to supply signage for the project. Repro Signs chose products from Avery Dennison Refiective Solutions.

Avery Dennison products, sent by Repro Signs from South Africa, included reflective sheeting and sign-converting supplies required to create all of the project’s highway signs. Given the sea voyage delivery time, all orders had to be filled perfectly first time every time, said Johan Winterbach, southern Africa area business manager for Avery Dennison.

For more information on companies in this article

Related Content

  • South African road maintenance works
    December 9, 2021
    Road maintenance works are planned in South Africa’s Eastern Cape.
  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out
  • Further delays expected for the Fehmarn Belt Fixed Link
    August 26, 2015
    Further delays to the planned Fehmarn Belt Fixed Link between Germany and Denmark appear likely because of objections to the project during the planning stages, Danish media reported. Government authorities in the German state of Schleswig-Holstein indicated that permission for the project, which focusses on a 17km immersed road and rail tunnel, will probably be given in 2017, and not next year as previously believed. German authorities have received about 3,100 objections to the project that has rise
  • New methods for non-destructive concrete testing
    August 29, 2017
    How best is it possible to assess the state of concrete in a road pavement, bridge deck or tunnel wall? One of the most reliable ways is to take a core of concrete from the structure to analyse and test in the laboratory. One downside to this method is that doing the test creates weak points in the structure that must then be repaired. Another is that the frequency of such cores cannot be too great – so it is possible that some problem areas will be missed. New technologies from the world of geospatial eng