Skip to main content

Qumak-Sekom wins tender to build traffic management system

Qumak-Sekom, the Polish IT integrator, has made the lowest bid (US$39.57 million) in a tender to build an integrated traffic management system for Gdansk, Gdynia and Sopot (the so-called TriCity).
April 26, 2012 Read time: 1 min
5281 Qumak-Sekom, the Polish IT integrator, has made the lowest bid (US$39.57 million) in a tender to build an integrated traffic management system for Gdansk, Gdynia and Sopot (the so-called TriCity). If no appeals are submitted by other bidders (Asseco Poland, UTI Polska, a consortium of 5278 Atrem and 5279 PBG, a consortium of Alcatel, 5264 Indra and Mirabel Investments, and a consortia of 5280 Wasko and Gertrude) in the next ten days, Qumak-Sekom will be able to sign a contract.

For more information on companies in this article

Related Content

  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan
  • Bucharest win for Aktor-Eurocontsruct
    October 27, 2021
    Lot 3 of the Bucharest south ring road is worth around €173.76 million.
  • Poland road tenders being announced
    October 5, 2015
    Polish General Directorate for National Roads and Motorways (GDDKiA) is announcing tenders for the construction of a series of major routes. One key stretch is for a 41km section of the S14 dual carriageway, which will link the A2 highway with the S8 dual carriageway and which will constitute Lodz's western ring-road. According to declarations of the Polish Infrastructure and Development Ministry, work on the S14 project will commence in 2016.
  • Contractors win Polish road tender
    August 13, 2015
    Two contracts have been awarded for work on sections of Poland’s S7 dual carriageway. Contractor Metrostav has won the tender process for the construction of a stretch of the S7 dual carriageway. The 20km section of the route Metrostav has the contract for lies between Gdansk's southern ring-road and Elblag. The value of this project is anticipated as being in the region of €392 million. Meanwhile contractor Budimex was won the package of works for the second section of the S7 dual carriageway. This 19km lo