Skip to main content

Poland: tenders open for S19 in Podlasie

Poland has invited tenders for another stretch of its section of the Via Carpathia.
By David Arminas March 13, 2020 Read time: 1 min
Poland works on more Via Carpathia sections (© Akapelux/Dreamstime.com)

Poland has invited tenders for construction of a 5km stretch of the S19 Via Carpathia between Dobrzyniew and Bialystok Zachod junction in Podlasie province.

Bids must be submitted by April 14 for work to start in 2022 with completion in 2024.

The S19, as well as the S61, in Poland constitute part of the trans-European route Via Carpathia, of which many sections are either under conastruction or in the planning stages. It will eventually connect Klaipėda in Lithuania with Thessaloniki in Greece.

Poland’s Expressway S19 will run from the border crossing to Belarus in Kuźnica through Białystok, Lublin and Rzeszów to the border with Slovakia at Barwinek, where it will connect with Slovakia’s future R4 Expressway.

Related Content

  • Healthy bidding for Poland's highway construction
    May 14, 2012
    Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.
  • Polish projects awarded
    February 3, 2021
    A series of Polish road projects have been awarded.
  • Polish projects pushing ahead
    October 6, 2016
    Key road projects in Poland look set to move forward. A tender process will commence shortly for a project in Lodz. Poland’s road authority, GDDKiA, will start the Western ring-road tender process. Poland's Infrastructure Ministry will give the go-ahead. The project involves building under 29km of the S14 dual carriageway to complete the circle around Lodz. The project is expected to be worth close to €392 million in all. The first stage runs from the Lodz Lublinek junction to the Lodz Teofilow junction and
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the