Skip to main content

Ontario’s Highway 407 East Phase 2B extension opens

The 23km final extension phase of the provincially-owned tolled freeway Highway 407 East near Toronto, Canada has opened.
By David Arminas January 23, 2020 Read time: 2 mins
Open for business: Highway 407 East near Toronto, Canada (photo courtesy 407 ETR)

Highway 407 East is part of the Ontario province’s Highway 407 project, a major Toronto bypass that includes the 108km 407 ETR – Express Toll Route – that is operated by concession to a private company, itself called 407 ETR Concession.

The 407 ETR company is owned by subsidiaries of the Canada Pension Plan Investment Board (50.01%), Cintra Global, a wholly owned subsidiary of Ferrovial (43.23%) and by SNC-Lavalin (6.76%).

Highway 407 East is connected to 407 ETR and allows drivers a speedy trip north of Toronto – Canada’s largest city and financial centre. The route runs through the Toronto suburb towns and cities of Burlington, Oakville, Mississauga, Brampton, Vaughan, Markham, Pickering, Whitby and Oshawa before ending in Clarington, north of Bowmanville.

Phase 1 of 407 East opened in Oshawa in 2016. The 9.6km Phase 2A opened in January 2018. The 14km Phase 2B just opened and includes another tolled north-south link between Highways 401 and 407 known as Highway 418.  The new stretch of Highway 407 and new Highway 418 is fully owned and operated by the province of Ontario.

Last September, 407 ETR opened 14 new lane-kilometres on Highway 407 ETR between Markham Road and York-Durham Line. This marks the second year in a row that 407 ETR has opened new lanes on the highway. Since 407 ETR was given the concession, it has doubled the footprint of its section of Highway 407 - adding over 567km of roadway since 2001 at a cost of around US$1.2 billion.

The company pays all costs of operating the 407 ETR, including the full cost of policing, snow removal, enforcement by the Ministry of Transportation and repairs and maintenance to the roadway.

According to the concession operator, average daily workday trips on 407 ETR increased 75% from 237,000 in 1999 to more than 415,000 in 2018. Also, 407 ETR is fully electronic tolling - barrier free. Motorists receive only one invoice for the use of Highway 407, 412, 418 and/or 407 ETR. This includes transponder leases, monthly account charges and video toll charges.

For more information on companies in this article

Related Content

  • Aecon sells Ontario road business to GIP
    May 18, 2023
    Canadian infrastructure group Aecon has sold its Ontario-based construction and aggregates business Aecon Transportation East to Green Infrastructure Partners.
  • Land acquisition delays the start of Bratislava's orbital road
    September 25, 2017
    Land acquisition issues have stalled the start of construction of Bratislava’s orbital road by up to eight months. Work could begin this autumn, according to a report by the Slovak Spectator, because the government is working on laws that would allow construction before all land is acquired.
  • Vinci boosts stake in Confederation Bridge
    April 15, 2022
    Vinci Highways agreement to buy OMERS Infrastructure's shares in Strait Crossing Development (SCDI) will boost the French group’s stake in SCDI, the Canadian bridge's concession holder.
  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop