Skip to main content

Manchester focuses on Cyclops junction

Manchester City has an eye for a better cycling experience.
By David Arminas July 20, 2020 Read time: 2 mins
The Cyclops design fully segregates cyclists from general traffic (photo: courtesy Colas)

The UK‘s first Cyclops junction - cycle optimised protected signals - has been launched in Hulme in Greater Manchester.

The Cyclops design fully segregates cyclists from general traffic, improving safety for all road users. Pedestrians are also able to get where they want to be in fewer stages with more space to wait than on other junction designs.

It was installed as part of the Manchester-to-Chorlton cycling and walking route. It is also part of Greater Manchester’s Bee Network, a nearly 2,900km joined-up walking and cycling network that connects every community across the city-region.

The Cyclops junction has a so-called external orbital cycle route that separates cyclists from motor traffic, according to Richard Butler and Jonathan Salter, transportation engineers with the Transport for Greater Manchester and designers of the Cyclops layout. Bicycles approaching from all four “arms” can use the cycle track which encircles the junction to make left, ahead and right turning movements safely protected from traffic.

Another benefit of the design is that cyclists have a protected right turn on a gentle radius and can filter left without signal control. Also, journey times for all modes of transport using the intersection - including motor traffic - are not negatively affected.

Construction was carried out by Colas UK, wholly-owned by the Colas Group, a French international contractor and part of Bouygues. Care was taken to minimise disruption to the traveling public and local residents. Colas developed a programme which delivered the works in small-low impact phases which were coordinated with the flow of traffic, again allowing for the least disruption.

Chris Boardman, Greater Manchester’s first cycling and walking commissioner, praised the layout. “Particularly right now, as we’ve seen cycling trips up by 34% and cycling and walking trips now counting for 33% of all journeys in Greater Manchester,” said Boardman who was a professional bicycle racer and Tour de France prologue winner, as well as an Olympic track gold medallist in the individual pursuit. “This junction design will make journeys easier and smoother for those doing their bit by cycling or walking, without impacting negatively on any other modes.”

The next Cyclops layout will be at Manchester’s Newport Street, by Bolton Station. More than 30 more layouts are in development across the 10 Manchester area districts.

For a free 16-page downloadable pdf of the programme and Cyclops design, visit the Transport for Greater Manchester website.

Related Content

  • LiuGong is investing in its facilities and product line
    November 29, 2012
    The acquisition of the HSW firm making the Dressta bulldozers has been strategically important for LiuGong. This facility is its first factory in Europe and has brought with it a very well-proven product line. The factory has benefited from a number of changes and David Beatenbough, vice president of LiuGong research and development said, “What we’ve found is that every machine tool is old but the maintenance has been tremendous. We’ve only had to replace one or two machine tools. So for this year we’ve bee
  • London Lower Thames Crossing link
    October 10, 2018
    Progress is being made with regard to the proposed Lower Thames Crossing project close to London.
  • Developments in tolling technology
    February 27, 2012
    Jason Barnes reviews the last few decades and the future of tolling technology. Tolling and charging technology has evolved significantly over the last three decades and that evolution is perhaps best illustrated by reductions in or complete removal of impedances to physical progress. Once, it was customary for a driver to pull up to a barrier, make some form of cash payment to a human operative in a booth, and then wait for the barrier to be raised before proceeding. Humans were eventually complemented and
  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.