Skip to main content

Manchester focuses on Cyclops junction

Manchester City has an eye for a better cycling experience.
By David Arminas July 20, 2020 Read time: 2 mins
The Cyclops design fully segregates cyclists from general traffic (photo: courtesy Colas)

The UK‘s first Cyclops junction - cycle optimised protected signals - has been launched in Hulme in Greater Manchester.

The Cyclops design fully segregates cyclists from general traffic, improving safety for all road users. Pedestrians are also able to get where they want to be in fewer stages with more space to wait than on other junction designs.

It was installed as part of the Manchester-to-Chorlton cycling and walking route. It is also part of Greater Manchester’s Bee Network, a nearly 2,900km joined-up walking and cycling network that connects every community across the city-region.

The Cyclops junction has a so-called external orbital cycle route that separates cyclists from motor traffic, according to Richard Butler and Jonathan Salter, transportation engineers with the Transport for Greater Manchester and designers of the Cyclops layout. Bicycles approaching from all four “arms” can use the cycle track which encircles the junction to make left, ahead and right turning movements safely protected from traffic.

Another benefit of the design is that cyclists have a protected right turn on a gentle radius and can filter left without signal control. Also, journey times for all modes of transport using the intersection - including motor traffic - are not negatively affected.

Construction was carried out by Colas UK, wholly-owned by the Colas Group, a French international contractor and part of Bouygues. Care was taken to minimise disruption to the traveling public and local residents. Colas developed a programme which delivered the works in small-low impact phases which were coordinated with the flow of traffic, again allowing for the least disruption.

Chris Boardman, Greater Manchester’s first cycling and walking commissioner, praised the layout. “Particularly right now, as we’ve seen cycling trips up by 34% and cycling and walking trips now counting for 33% of all journeys in Greater Manchester,” said Boardman who was a professional bicycle racer and Tour de France prologue winner, as well as an Olympic track gold medallist in the individual pursuit. “This junction design will make journeys easier and smoother for those doing their bit by cycling or walking, without impacting negatively on any other modes.”

The next Cyclops layout will be at Manchester’s Newport Street, by Bolton Station. More than 30 more layouts are in development across the 10 Manchester area districts.

For a free 16-page downloadable pdf of the programme and Cyclops design, visit the Transport for Greater Manchester website.

Related Content

  • Certified safe: ARTBA president talks future highways and safety
    January 16, 2020
    What keeps Dave Bauer* up at night? David Arminas caught up with the head of ARTBA at his Washington D.C. office during daylight hours
  • TRL acquires Transport & Travel Research
    April 15, 2014
    TRL has announced the acquisition of Transport & Travel Research (TTR) making it a wholly owned subsidiary of TRL. A minority shareholder in TTR since 2010, TRL has stated that TTR will continue to operate as an independent organisation. TTR’s chairman, David Blackledge, has stepped down from the Board to take on a role as Special Advisor, while TRL's chief executive, Rob Wallis, is appointed chairman of TTR (in addition to his other group company responsibilities) with immediate effect. All other operat
  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • High speed bridge demolition minimises disruption
    February 16, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.