Skip to main content

Malaysian traffic monitoring

The Malaysian the government will use over 1,000 cameras to monitor roads nationwide under its Automated Enforcement System (AES) scheme. The programme will see 250 mobile cameras, 566 fixed speed cameras and 265 traffic light cameras being used to monitor the roads. It is claimed that each camera will be able to capture around 600 road offenders daily.
August 7, 2012 Read time: 1 min
The Malaysian the government will use over 1,000 cameras to monitor roads nationwide under its Automated Enforcement System (AES) scheme. The programme will see 250 mobile cameras, 566 fixed speed cameras and 265 traffic light cameras being used to monitor the roads. It is claimed that each camera will be able to capture around 600 road offenders daily.

Related Content

  • Piers completed for Morandi Bridge replacement project
    February 20, 2020
    The last of the 18 elliptical 40m-tall piers have been finished.
  • Motorway's tricky cable installation
    February 6, 2012
    The UK is now benefiting from the installation of sophisticated automated traffic management equipment and information signs on its motorway network. But with heavy traffic volumes on these roads, novel techniques have had to be implemented. One such operation, organised by client The Highways Agency and its consulting engineer A.One+, has recently been underway on the M56 motorway between Junctions 9 and 16 in north-west England under the Triple Package Advanced Works designation. To minimise traffic distu
  • Highways England on track with smart motorway upgrade near Cheshire
    September 28, 2018
    A 20tonne gantry – the biggest single structure under a major motorway upgrade in England - has been hoisted into place in Cheshire county.
  • Cats eyes from Clearview set the tone at Switch Island in the UK
    February 23, 2018
    Cats eyes, which light up in response to changing traffic lights, will be used for the first time in the UK at a motorway junction. Highways England, the government agency, is installing around 170 of the LED road studs at Switch Island, one of England’s busiest motorway junctions – used by over 90,000 vehicles every day. Installation is expected to take around a year to complete.