Skip to main content

Kekava Bybass opens with Kapsch technology

Latvia’s recently opened “high-speed” Kekava Bypass is using Kapsch traffic technology to ensure safety of drivers as they travel between the capital Riga and Lithuania.
By David Arminas December 5, 2023 Read time: 3 mins
Kapsch for Kekava: the nearly 18km-long bypass is part of the A7 Bauska Highway, one of Latvia’s busiest roads with an average daily traffic volume of 17,000 vehicles and up to more than 25,000 at peak periods (image © Renars Koris/Latvian State Roads - LVC, Latvijas Valsts Celi)

The Ķekava Bypass - Latvia's first "high-speed road" - opened in October and with it a traffic management system from Kapsch TrafficCom started operation.

The bypass is providing an efficient alternative for motorists travelling between the Latvian capital Riga, on the Baltic Sea, and neighbouring Lithuania to the south. Traffic in the small town of Ķekava is now being reduced.

Meanwhile, Kapsch TrafficCom's cameras, sensors and radar systems, as well as a modern and flexible traffic management software platform are contributing significantly to safety and sustainability along the bypass. "The Ķekava project is not only a milestone for road PPPs [public-private partnerships] and traffic in Latvia, but a testament to the positive influence of state-of-the-art technology on road safety," said Marko Frank, mobility expert and regional sales director at Kapsch TrafficCom.

The nearly 18km-long bypass is part of the A7 Bauska Highway, one of Latvia’s busiest roads with an average daily traffic volume of 17,000 vehicles and up to more than 25,000 at peak periods. The bypass is also designated part of pan-European TEN-T network called route E67 - the Via Baltica (Helsinki – Tallinn–Riga–Panevežys–Kaunas–Warsaw–Prague).

Construction of the €250 million bypass started in 2021 on what is the first highway in Latvia designated a high-speed road; pedestrians, cyclists and slow-moving agricultural vehicles are prohibited. However, pedestrians and cyclists are allowed on the parallel roads.

Juris Frīdmanis, general manager of the private partner consortium Kekava ABT, said he was confident that Kapsch TrafficCom technologies will ensure safe and efficient operation of the Ķekava Bypass for the next 20 years. It is monitored 24 hours per day thanks to more than 20 video surveillance cameras, two weather stations, traffic counting sensors, as well as data system analysing the traffic flow. Maximum driving speed on the bypass during the summer has been set at 120kmph but reduced to 90kph during winter - October 16 to April 15.

According to the client, the state-owned road management agency Latvian State Roads (LVC, Latvijas Valsts Celi) there are 900 lighting fixtures, 40km of steel and 4km of concrete safety barriers. Noise mitigation solutions such as noise barriers and soil embankments have been implemented along 7.5km of the road as well as 27km of animal fencing.

Innovative materials and technologies have been used in the construction of the bypass. For example, culverts, water drainage pipes and lighting poles made of glass fibre have been used, recycled PET bottles have been used in the production of bridge barriers and sound absorbers made of wood fibre are used in noise barriers.

The consortium Kekava ABT consists of the Luxembourg-based infrastructure fund TIIC 2 S.C.A. SICAR as well as Latvian construction firms AS A.C.B. and CBR SIA Binders. Ķekava Bypass is the first major PPP project in road construction in the Baltics to be implemented according to the design-build-finance-operate model.

The most important criterion in the evaluation of submitted bids was the price, according to LVC. The price aspect had 80% of the overall project cost evaluation, while the remaining 20% covered compliance with various criteria, such as the duration of works, traffic organisation during the works, organisation of routine maintenance, quality and risk management.

Two tenders were submitted and the Kekava ABT tender was selected as the economically most advantageous offer, which also had the lowest price. The private partner will guarantee that for another five years after the expiry of the PPP contract – 23 years from construction start – the Ķekava Bypass will remain in sufficiently good shape that it will require only daily maintenance works and no capital investment.

Kapsch TrafficCom, headquartered in Vienna, is a global provider of transportation solutions for sustainable mobility with projects in more than 50 countries. Products and services include solutions for tolling, tolling services, traffic management and demand-management.

For more information on companies in this article

Related Content

  • BAM, PGGM and Habau win German A10-A24 contract
    December 20, 2017
    A consortium of BAM-PGGM and HABAU has been appointed preferred bidder for extension of Germany’s A10-A24 motorway from Neuruppin to Pankow, near Brandenburg. The public-private partnership deal covering nearly 65km is worth around €1 billion over the 30 years of the contract, according to infrastructure project management company DEGES.
  • Transurban to test Melbourne drivers in road trials, including tolls
    June 23, 2015
    Melbourne’s road users are the focus of a year-long study into what options are possible for funding road infrastructure projects including various user-pays models. The study headed by Australian toll roads operator Transurban will conducted across Melbourne’s entire road network to see how drivers react to tolling and other road-use models such as charging motorists for each kilometre travelled, a charge to access roads, annual fixed costs per kilometre on expected usage and price per trip. It will al
  • Highway developments to boost east-west transport
    April 4, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports History was made in late 2010, when one of the biggest road building projects ever envisaged in Eastern Europe was given the green-light. It was the occasion when Russian president Dmitry Medvedev signed a law that would allow his country to build its segment of a huge highway around the Black Sea. The idea is to complete the 7,140km highway, wi
  • Tender process underway for Polish road projects
    August 18, 2014
    The tender process is underway for two major projects in Poland. One project involves constructing three sections of the new southern ring road around Polish capital Warsaw. Building the 18.5km stretch that comprises the three sections is expected to cost in the region of €1.6 billion. The Polish General Directorate for National Roads and Motorways (GDDKiA) says that bids have to be submitted by 10th October 2014. The A section will be some 4.6km long, the B section 6.45km long, whilst the C section will be