Skip to main content

Japan: End to weekday daytime expressway toll discounts in March 2014

Japan’s Ministry of Transport is to scrap weekday daytime toll discounts on some of the country’s expressways from late March 2014 after a poll discovered that they were failing to relieve traffic jams. A 30% discount is currently available to drivers on non-Osaka, Tokyo and its neighbouring area toll expressways operated by Central Nippon Expressway, West Nippon Expressway and East Nippon Expressway from 9am to 5pm. State subsidies are also allowing operators to offer further expressway toll discount
November 25, 2013 Read time: 1 min
Japan’s Ministry of Transport is to scrap weekday daytime toll discounts on some of the country’s expressways from late March 2014 after a poll discovered that they were failing to relieve traffic jams.

A 30% discount is currently available to drivers on non-Osaka, Tokyo and its neighbouring area toll expressways operated by Central Nippon Expressway, West Nippon Expressway and East Nippon Expressway from 9am to 5pm.

State subsidies are also allowing operators to offer further expressway toll discounts of 50% on weekdays from 5pm to 8pm and from 6am to 9am.

Related Content

  • Bechtel achieves tricky bridge replacement in tight timeframe
    March 21, 2012
    Contractor Bechtel has worked with Network Rail to complete a major road bridge upgrade in the UK. A construction team worked 104 hours consecutively to replace the bridge, located at Reading Station.
  • A new expressway link for Myanmar
    June 10, 2020
    A new expressway link is planned for Myanmar.
  • Sale is slow for South Klang Valley Expressway and Silk Highway
    June 8, 2016
    Malaysia’s South Klang Valley Expressway (SKVE) remains unsold despite being up for sale “for some tie”. The Star newspaper reported unnamed sources saying the SKVE has suffered from low traffic volumes, compared with the Silk Highway, which is now also up for sale. SKVE connects to the 37km Silk Highway – also known as the Kajang Traffic Dispersal Ring Road - at the Universiti Tenaga Nasional interchange, collectively stretching from Seri Kembangan to Pulau Indah. Together, 90km of continuous high
  • Fast resurfacing work in UK by contractor Eurovia
    May 15, 2017
    In the UK the contractor Eurovia has recently carried out a challenging resurfacing job within a tight timescale. The firm had to contend with live traffic on a busy stretch of motorway, while carrying out the work close to shared intersections. The traffic was particularly heavy also during part of the job due to a holiday period and large numbers of tourist vehicles using the stretch of motorway.