Skip to main content

Indonesia’s Trans Marga Jateng secures key new toll road loan

A US$415.45 million (IDR 4.7 trillion) loan has been agreed for a new 75.67km toll road as part of the Trans Java toll road project in Indonesia. Trans Marga Jateng, the 60:40 joint venture of Indonesian state-owned toll-road operator Jasa Marga and Central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, has secured the 15-year syndicated loan from a group of lenders headed by state-owned bank Bank Mandiri. The new toll road will run from Solo to Semarang through Salatiga and Boyola
April 8, 2014 Read time: 1 min
A US$415.45 million (IDR 4.7 trillion) loan has been agreed for a new 75.67km toll road as part of the Trans Java toll road project in Indonesia.

1075 Trans Marga Jateng, the 60:40 joint venture of Indonesian state-owned toll-road operator 1083 Jasa Marga and Central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, has secured the 15-year syndicated loan from a group of lenders headed by state-owned bank Bank 1077 Mandiri.

The new toll road will run from Solo to Semarang through Salatiga and Boyolali, part of the Trans Java toll road project between Merak (Banten) and Banyuwangi (East Java).

Of the total loan, $158.87 million (IDR 1.8 trillion) will come from Bank Mandiri, whereas the remaining $8.82 million (IDR 100 billion), $97.08 million (IDR 1.1tn), and $141.21 million (IDR 1.6 trillion) will be contributed by Regional Development Bank of Central Java (Bank 1080 Jateng), Bank 1081 Rakyat Indonesia (BRI), and 1079 Bank Negara Indonesia (BNI) respectively.

For more information on companies in this article

Related Content

  • Indonesia’s US$914.8mn Solo-Mantingan-Kertosono toll road will be a PPP
    June 3, 2013
    Indonesia’s proposed US$914.8 million (IDR 8.97tn) 177km Solo-Mantingan-Kertosono toll road is to be developed under the public private partnership (PPP) scheme with Theis Contractors Indonesia, according to Rido Matari Ichwan, head of planning and public works at the Ministry of Foreign Affairs. The project will be receiving loans from China amounting to $300 million. Construction is expected to start by end of 2013.
  • Key toll road projects underway in Indonesia
    September 30, 2014
    Work is progressing on the second phase of a new tolled highway in Indonesia, with a consortium carrying out the construction of the connection between Kualanamu and Tebing Tinggi. The consortium comprises three state-owned construction firms, Pembangunan Perumahan (PP); Hutama Karya; Waskita Karya and toll road operator, Jasa Marga. Construction of the second phase of the project, the connection between Kualanamu Airport and Tebing Tinggi, is underway. In all the construction of the first and second phases
  • Indonesian toll road firm to expand network
    December 14, 2015
    State-owned Indonesian toll road firm Jasa Marga plans to increase its network by 460km by 2018. This will bring its total network to 1,050km by 2018. During 2016, Jasa Marga intends to spend US1 billion developing its toll road network and general operations. By 2018, the Trans Java toll road should be open to traffic.
  • Indonesia’s toll road network is expanding
    August 17, 2018
    Indonesia continues to expand its toll road network, with major routes being built and opening to traffic. The toll road firm Jasa Marga will expand its network from 787km to 1,000km by the end of 2018. Four key sections of toll road will be complete at the end of 2018, linking Gempol and Pasuruan, Salatiga and Kartasura, Wilangan and Kertosono and Batang with Semarang.