Skip to main content

HDR wins I-710 Corridor study

The Los Angeles County Metropolitan Transportation Authority (Metro) has approved the selection of HDR to perform the I-710 Corridor Project North Utility study.
March 14, 2012 Read time: 1 min
RSSThe 3227 Los Angeles County Metropolitan Transportation Authority (Metro) has approved the selection of 2418 HDR to perform the I-710 Corridor Project North Utility study. The Long Beach Freeway (I-710), a vital transportation artery, links the ports of Long Beach and Los Angeles to major Southern California distribution centres and intermodal rail facilities. An essential component of the regional, statewide and national transportation system, it serves both passenger and goods movement vehicles.

In response to the need to improve traffic and safety conditions caused by population growth, increased cargo container volume at the ports of Los Angeles and Long Beach, increasing traffic volumes and an aging infrastructure, Metro and its project partners are preparing to make improvements to the I-710 corridor between SR 60 and the ports.

HDR will provide comprehensive utility relocation strategy and advance planning studies for the segment of the I-710 corridor that stretches from north of the Los Angeles River to the SR 60 freeway. The company’s work includes complex geometric design for a six-mile segment of the planned freight corridor, analysis of river hydraulics and relocation strategies for high-voltage electrical transmission lines in the highly constrained Los Angeles River corridor.

For more information on companies in this article

Related Content

  • Integrated corridor management offers transportation efficiency
    May 28, 2013
    In the Intelligent Transportation Systems world, the concept of managing roadway or transportation corridors is not new. Smart Corridor concepts have existed for some time, such as the Santa Monica Smart Corridor system from the 1990s. Across the world, a new emerging model for operating roadway transportation networks called integrated corridor management (ICM) has emerged. This is particularly true in California, where several new ICM projects have or are being deployed. There is a new paradigm for corrid
  • RBF Consulting selected for 'hot spots' feasibility analysis
    February 27, 2012
    RBF Consulting has been selected by the Los Angeles County Metropolitan Transportation Authority to provide transportation planning and engineering for the Measure R funded I-605 Congestion 'Hot Spots' Feasibility Analysis.
  • I-95 Corridor Coalition vehicle probe project massively expanded
    May 4, 2012
    The I-95 Corridor Coalition, the University of Maryland and Inrix have announced a three-year extension and expansion of the I-95 Coalition Vehicle Probe Project (VPP), operational since 2008, that uses crowd-sourced traffic data and advanced analytics techniques to turn billions of data points into insights that are transforming the manner in which member states build, manage and measure their road networks.
  • California highway project – report published
    July 17, 2017
    The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the California Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.