Skip to main content

California highway project – report published

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the California Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.
July 17, 2017 Read time: 1 min

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the 2451 California Department of Transportation and the 3227 Los Angeles County Metropolitan Transportation Authority. When the project is complete it will boost safety and cut congestion on SR-138 between the I-5 and SR-14 in the north of Los Angeles County. The area suffers heavily from traffic jams and delays are common for road users. The studies into the options available showed that the best alternative was for the expressway/limited access conventional highway. However the sections of SR-138 that will not be incorporated into the route improvements will now become local access roads.

The plan calls for a six-lane divided Freeway and Expressway running between the I-5 interchange to Gorman Post Road and from Gorman Post Road to 300th Street West. The plan also includes four-lane divided Expressway and Limited Access Conventional Highway from 300th Street West to 240th Street West and from 240th Street West to SR-14. However financing for the work has yet to be established.

Related Content

  • HDR wins I-710 Corridor study
    March 14, 2012
    The Los Angeles County Metropolitan Transportation Authority (Metro) has approved the selection of HDR to perform the I-710 Corridor Project North Utility study.
  • RBF Consulting selected for 'hot spots' feasibility analysis
    February 27, 2012
    RBF Consulting has been selected by the Los Angeles County Metropolitan Transportation Authority to provide transportation planning and engineering for the Measure R funded I-605 Congestion 'Hot Spots' Feasibility Analysis.
  • Busy California highway upgrade is underway
    January 24, 2022
    Work is well underway on the planned upgrade for a busy California highway.
  • Parsons wins contract for busy California route
    June 13, 2018
    Parsons is now working on a project to improve the State Route 91 Freeway in California’s Orange County. Parsons has won an on-call consulting services agreement contract from the Orange County Transportation Authority (OCTA). The Orange County segment of the 91 Express Lanes consists of a four-lane toll facility located on the median of the State Route 91 freeway. The SR 91 route runs between the south side of Los Angeles, straight out of Compton, and the east of the city, to Riverside, where it becomes I-