Skip to main content

First half of Renfrew Bridge arrives by barge

VIDEOS: Graham Construction is building the swing Renfrew Bridge for Renfrewshire Council, Scotland, as part of the €137m Clyde Waterfront and Renfrew Riverside development project.
By David Arminas May 10, 2024 Read time: 2 mins
The furstr half of 184m-long cable-stayed twin-leaf bridge passing under the Erskine Bidge in Scotland (image courtesy Graham Construction/Renfrew Council)

The first half of a new swing bridge over the River Clyde in Renfrew, has arrived on site by barge from the Netherlands.

Principal contractor Graham Construction is building the Renfrew Bridge for Renfrewshire Council as part of the €137m Clyde Waterfront and Renfrew Riverside development project.

The 184m-long cable-stayed twin-leaf bridge will carry a two-lane road connecting Renfrew with Yoker and Clydebank over the River Clyde.

Graham Construction said the south section of the bridge sailed up the River Clyde after completing a seven-day barge trip from the Netherlands, via the English Channel and up the Irish sea to reach the west coast of Scotland.

Graham’s team will install the first section on the Renfrew side of the river at Meadowside Street, ahead of the north section of the bridge arriving next month. It will be fixed into place at Dock Street in Yoker.

Renfrewshire Council has said that the bridge should be open ahead of schedule for pedestrians, cyclists and motorists by the end of this year.

The bridge was manufactured by Hollandia Infra in the small industrial town of Krimpen aan den Ijssel on the Nieuwe Masse, a tributary of the Rhine River in Dutch province of South Holland.

Due to its length and weight of 1,600tonnes, lifting required three floating cranes, Matadors, from Rotterdam-based heavy lifting specialist Bonn & Mees. Using SPMTs – self-propelled modular transporters - the bridge was brought into load-out position along the quay where the three Matador cranes took over the weight and maneuvered the bridge onto the pontoon, supplied by heavy transportation and lift specialist Sarens.

For more information on companies in this article

Related Content

  • Bridge deck launched for the New Wear Crossing, Sunderland (Video)
    March 30, 2017

    The 300m bridge deck of Sunderland’s New Wear Crossing has been successfully launched across the river.

    The 4,750tonne concrete and steel deck was resting on the south side of the River Wear from where it was inched across to touch the north side in a 20-hour operation. It had to slide through the twin arched towers of the bridge’s double pylon on its way to its final position to connect the city regions of Pallion to the south and Castletown to the north.

  • Scottish infrastructure contract
    July 2, 2021
    Amey Consulting wins Scottish infrastructure contract.
  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges