Skip to main content

First half of Renfrew Bridge arrives by barge

VIDEOS: Graham Construction is building the swing Renfrew Bridge for Renfrewshire Council, Scotland, as part of the €137m Clyde Waterfront and Renfrew Riverside development project.
By David Arminas May 10, 2024 Read time: 2 mins
The furstr half of 184m-long cable-stayed twin-leaf bridge passing under the Erskine Bidge in Scotland (image courtesy Graham Construction/Renfrew Council)

The first half of a new swing bridge over the River Clyde in Renfrew, has arrived on site by barge from the Netherlands.

Principal contractor Graham Construction is building the Renfrew Bridge for Renfrewshire Council as part of the €137m Clyde Waterfront and Renfrew Riverside development project.

The 184m-long cable-stayed twin-leaf bridge will carry a two-lane road connecting Renfrew with Yoker and Clydebank over the River Clyde.

Graham Construction said the south section of the bridge sailed up the River Clyde after completing a seven-day barge trip from the Netherlands, via the English Channel and up the Irish sea to reach the west coast of Scotland.

Graham’s team will install the first section on the Renfrew side of the river at Meadowside Street, ahead of the north section of the bridge arriving next month. It will be fixed into place at Dock Street in Yoker.

Renfrewshire Council has said that the bridge should be open ahead of schedule for pedestrians, cyclists and motorists by the end of this year.

The bridge was manufactured by Hollandia Infra in the small industrial town of Krimpen aan den Ijssel on the Nieuwe Masse, a tributary of the Rhine River in Dutch province of South Holland.

Due to its length and weight of 1,600tonnes, lifting required three floating cranes, Matadors, from Rotterdam-based heavy lifting specialist Bonn & Mees. Using SPMTs – self-propelled modular transporters - the bridge was brought into load-out position along the quay where the three Matador cranes took over the weight and maneuvered the bridge onto the pontoon, supplied by heavy transportation and lift specialist Sarens.

For more information on companies in this article

Related Content

  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Clyde Bridge contract opening for tender
    August 2, 2019
    The tender process for the planned Clyde Bridge project in Scotland is now opening. The swing bridge is expected to cost €100 million to construct and will be the first of its type spanning the River Clyde. Connecting Renfrew with Yoker, the bridge is part of a wider programme of work to boost transport links in the area, with 2km of roads and facilities for vulnerable road users also being planned.
  • Causeway and immersed road for LagoonHull
    December 1, 2021
    The agency proposing the UK’s LagoonHull project says it’s development and construction costs could be between €1.2-2.4 billion.
  • Poetry in motion
    August 9, 2018
    A heavy-lift operation by Roll-iT using Enerpac equipment delivered a bridge deck - with a poem engraved on the underside - to Antwerp’s old harbour Only when the deck of the new Londenbrug Bridge is raised do travellers see the poem by Antwerp poet Stijn Vranken. It is written large on the underside of the 300tonne prefabricated steel deck. People waiting for a ship to pass the raised bridge now contemplate the poem’s message about ships transporting goods and people to and from the four corners of the