Skip to main content

Fehmarn start for Germany

The Fehmarn Belt Fixed Link will cut journey times between Copenhagen and Hamburg.
By David Arminas December 8, 2021 Read time: 1 min
Cars will take an estimated 10 minutes and trains seven minutes to go through the 18km tunnel (image courtesy Femern A/S)

Construction of the €7 billion (US$8.21 billion) Baltic Sea tunnel has begun on the German side of mega-project that will connect the Danish capital Copenhagen and Hamburg.

The tunnel will run between Lolland, Denmark’s fourth largest island, and the German island of Fehmarn off the eastern coast of Germany’s Schleswig-Holstein state.

The Fehmarn Belt Fixed Link will drastically cut road and rail train journey times between the two cities when it is completed in 2029. Government and construction officials met near the village of Puttgarden on Fehmarn for a sod-turning ceremony. Work has already started on the Danish side, on the island of Lolland.

Danish firm Femern A/S, in charge of the project, says it will be the world's longest road and rail tunnel. Cars will take an estimated 10 minutes and trains seven minutes to go through the 18km tunnel.

The tunnel will consist of 79 standard 217m-long elements around 10m high with two highway tubes, one emergency tube and two rail tubes. There will be 10 service elements, each 85.7m-long but both wider and higher and with a subfloor to house technical and servicing equipment. The deepest section of the Fehmarn Belt Trench, into which the tunnel elements will be laid, will be 35m.

For more information on companies in this article

Related Content

  • Meet Die Autobahn des Bundes
    November 8, 2021
    Only recently has Germany created a central organisation to maintain and develop the nation’s 13,200km of motorways, called autobahns. Moving from 16 state-run operation centres to one lead centre is a challenge but essential, says Gerd Riegelhuth.
  • New German bridge links
    July 9, 2012
    Two border crossing bridges are being planned to link Germany with other European nations, Denmark and Luxembourg. The Danish engineering consultancy company Cowi has the contract to design a 19km bridge across the Fehmarn Belt between Denmark and Germany. Planning is expected to take three years and the project will entail major engineering challenges.
  • Germany’s flooding has damaged roads
    August 3, 2021
    Germany’s recent heavy flooding has damaged roads.
  • Bavarian road tunnel opens to traffic
    June 1, 2022
    A new Bavarian road tunnel is now open to traffic