Skip to main content

Fehmarn start for Germany

The Fehmarn Belt Fixed Link will cut journey times between Copenhagen and Hamburg.
By David Arminas December 8, 2021 Read time: 1 min
Cars will take an estimated 10 minutes and trains seven minutes to go through the 18km tunnel (image courtesy Femern A/S)

Construction of the €7 billion (US$8.21 billion) Baltic Sea tunnel has begun on the German side of mega-project that will connect the Danish capital Copenhagen and Hamburg.

The tunnel will run between Lolland, Denmark’s fourth largest island, and the German island of Fehmarn off the eastern coast of Germany’s Schleswig-Holstein state.

The Fehmarn Belt Fixed Link will drastically cut road and rail train journey times between the two cities when it is completed in 2029. Government and construction officials met near the village of Puttgarden on Fehmarn for a sod-turning ceremony. Work has already started on the Danish side, on the island of Lolland.

Danish firm Femern A/S, in charge of the project, says it will be the world's longest road and rail tunnel. Cars will take an estimated 10 minutes and trains seven minutes to go through the 18km tunnel.

The tunnel will consist of 79 standard 217m-long elements around 10m high with two highway tubes, one emergency tube and two rail tubes. There will be 10 service elements, each 85.7m-long but both wider and higher and with a subfloor to house technical and servicing equipment. The deepest section of the Fehmarn Belt Trench, into which the tunnel elements will be laid, will be 35m.

For more information on companies in this article

Related Content

  • Renovation set for the Freihafenelbbrücke
    March 4, 2021
    Freihafen Bridge opened in 1926 to improve transportation near the then Hamburg Free Port.
  • Cebu-Cordova Link Expressway opens
    April 28, 2022
    The 8.5km expressway, in which Cowi was owners engineer for the client Metro Pacific Tollways, incorporates the longest and tallest bridge in the Philippines.
  • VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting
    November 3, 2016
    4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

    The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

    Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.
  • LagoonHull project put on hold
    February 8, 2023
    The plan by the UK city of Kingston upon Hull is to transform the city centre and river frontage running from the 2.2km-long, single-span suspension Humber Bridge.