Skip to main content

Elonroad’s electric road and recharging lane for buses in Lund

Sweden’s Transport Administration (Trafikverket) has awarded a contract to the Elväg Syd consortium for an electric and recharging bus lane in the city of Lund. The demonstration area will be built in the bus lane along 1km of Getingevägen Road near central Lund. Construction will begin during the first quarter of 2020 and last for three years. The project’s budget is €9.3 million of which Trafikverket will contribute €8.3 million with the other consortium players supplying the remaining funds. Lun
April 17, 2019 Read time: 3 mins

Sweden’s Transport Administration (1096 Trafikverket) has awarded a contract to the Elväg Syd consortium for an electric and recharging bus lane in the city of Lund.

The demonstration area will be built in the bus lane along 1km of Getingevägen Road near central Lund. Construction will begin during the first quarter of 2020 and last for three years.

The project’s budget is €9.3 million of which Trafikverket will contribute €8.3 million with the other consortium players supplying the remaining funds.

Lund is a historic town of around 91,000 people with cobbled streets and home to Lund University, one of Sweden’s oldest educational institutes. The city also has one of Europe’s most developed cycling infrastructure. There are 4,800 bike parking spaces in the town, including a multi-storey facility at the railway station, more than 260km of bicycle paths and lanes. The government estimates that around 43% of journeys within the city are by bicycle.

The Elväg Syd consortium, which includes state, educational and private sector players, will use technology developed by one of the consortium members, Elonroad. Other members are Innovation Skåne coming on board as project manager, Kraftringen Energi, Lund municipality, Lund University of Technology, Skånetrafiken, Solaris Sverige and Sweden’s National Road and Transport Research Institute (7264 VTI).

The test road is based on a 200m long test track set up outside Lund in 2017 (see video). Elonroad’s concept involves a conductive rail - 5cm high and 30cm wide - laid on top of the asphalt or concrete road surface. The rail acts as a recharging infrastructure for electric vehicles with electric motors and batteries – although the Lund test site will be for only buses. The rail also has inclined sides to make it smooth for vehicles when drivers change lanes.

The rail consisting of short grounded segments are arranged along a single track. Every second segment can switch to positive when a car passes over it. Three contactors will supply a steady current rectified with diodes before charging the battery.

Rainwater passes under the road. During winter, snow can be removed by a special plow developed by Elonroad. Ice on the top surface of the rail will be melted by a heating system. A grounded strip will stop leaking current from the positive segment under the vehicle.

When the driver exits the rail system, the vehicle’s batteries take over for non-electric roads. Batteries take over automatically at exits and roundabouts.

For more information on companies in this article

Related Content

  • Estonia surveys major roads with a RetroTek-M retroreflectometer
    May 22, 2019
    During the past two years, Estonia’s Road Administration has clocked up 4,021km during a retroreflectivity project on all main state roads and on basic roads. Estonia’s Road Traffic Development Department of the Estonian Road Administration has been working with ERC Consulting to gather retroreflectivity data on road markings on all main state roads and basic roads. The work has shown that out of 1,609km of main state roads, 20% had problems. The reflective effect is created by glass beads on the surf
  • IRF to hold four regional congresses in 2014
    March 28, 2014
    In 2013, IRF members launched three new regional affairs Committees covering Latin America & the Caribbean, the Middle East and Sub-Saharan Africa, each tasked with connecting with IRF members active in these regions and developing bespoke capacity building programs that leverage IRF know-how. IRF is also strengthening its program of operations in the Asia Pacific region following renewed interested expressed by senior government officials during the recent IRF World Meeting.
  • Skidmarks
    December 15, 2017
    Our Skidmarks page is highly rated by readers. Your input could help make this page even more entertaining. If you come across any amusing road-related stories or pictures email me at [email protected]
  • Oslo falling short of cycle path goal for 2023
    August 23, 2022
    The aim, set out in 2019, is to build 100km by 2023.