Skip to main content

Dufferin wins Bradford Bypass work in Canada

The 16km four-lane highway - also known as the Highway 400–404 Link - will connect freeways Highway 400 and Highway 404 in Ontario.
By David Arminas August 6, 2024 Read time: 1 min
Let the work begin (image © Gregory21/Dreamstime)

Dufferin Construction has won a US$66.1 million contract for construction of a portion of controlled-access Bradford Bypass freeway in the Canadian province of Ontario.

The 16km four-lane highway - also known as the Highway 400–404 Link - will connect freeways Highway 400 and Highway 404 through the towns of Bradford and East Gwillimbury.

Dufferin’s work includes the construction of a southbound lane on Highway 400 that will merge with the yet-to-built Bradford Bypass, the expansion of Simcoe County Road 88 from two lanes to four, renovation of Highway 400-Simcoe County Road 88 interchange and an underpass bridge.

Dufferin recently started work and will also complete basic works for future expansion of Highway 400 platform to 10 lanes.

The Ontario government recently awarded the US$11.6 million contract to AECOM for detailed design of the 6.5km west section of the Bradford Bypass from Highway 400 to Simcoe County Road 4.

For more information on companies in this article

Related Content

  • Road tolling is vital for good roads
    January 2, 2024
    Upcoming transportation projects are outlined in planning documents throughout America by Mary Scott Nabers
  • British Colombia in Canada plans major road investment
    March 20, 2015
    In Canada the British Colombia Government has announced a programme of road and highway upgrades worth a total of US$1.99 billion (C$2.5 billion). The investment will be used to rehabilitate side roads, highways and bridges across the province. This plan will include repaving some 1,000km/year of provincial highway, with this plan stretching out over a period of 10 years. A key portion of the work will be to widen Highway 1 section to six lanes between Abbotsford and Langley. The proposed plan has been titl
  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b
  • Protest storm over new US$0.5bn Nevada highway
    August 20, 2012
    The most expensive highway ever built in Nevada will open before the end of August to a storm of protest. The new 13.7km Interstate 580 three-lane motorway, which is reported to have cost more than US $0.5 billion to construct, has been dubbed a vanity project by local politicians.