Skip to main content

Czech tenders for D6 section near Karlovy Vary

The Petrohrad-Lubenec section includes several bridges with work starting by the end of the year for completion in 2026.
By David Arminas June 7, 2023 Read time: 2 mins
The spa city of Karlovy Vary, with around 50,000 inhabitants, is along the D6 motorway (image © Ronstik/Dreamstime)

The Czech Republic has tendered for construction of a 12km section of the D6 motorway in Karlovy Vary worth around €208.63 million.

Karlovy Vary, with around 50,000 inhabitants, is about 106km west of the capital city Prague. It lies at the confluence of the Ohře with the Teplá and Rolava rivers. The national road and motorway directorate RSD that the Petrohrad-Lubenec section includes several bridges with work starting by the end of the year for completion in 2026.

The D6, when completed, will go from Prague through Karlovy Vary and Cheb to the border with Germany. Its first segment was opened in 1980s.

Meanwhile, the government will start looking for a concessionaire for the D35 motorway project in the third quarter of this year when the qualification round for the project will be announced. The two longest missing sections of the motorway will be financed and built by the private sector as part of the public-private project. Cost of the PPP project is expected to come in at around €1.35 billion. Work is due to be completed in 2027.

Last month it was reported that a year after the start of construction, the Czech Republic’s first and only road public-private partnership is on schedule for opening in early 2025. Since 2021, VINCI Highways has led ViA SALis, the consortium for constructing and operating the 32km-long D4 Via Salis. The motorway will link Příbram in central Bohemia to Písek, southern Bohemia. ViA SALis is a 50/50 venture between VINCI and Meridiam.

 

Related Content

  • Romania: more A3 soon to open
    October 28, 2020
    Around 160km of the A3 are now open.
  • A6 project between Weinsberg and Wiesloch/Rauenberg set to start
    January 26, 2017
    Work will soon start on the €1.3 billion project to widen a stretch of the A6 motorway, one of Germany’s most congested highways. Both sides of the motorway between the Weinsberg and Wiesloch/Rauenberg junctions will be expanded. On 25 km of the section being expanded under the project – altogether 47.1 km – the number of lanes will be increased from four to six. The project also encompasses the construction of the 1.3km-long Neckartal Bridge. Preparatory work for the public-private partnership has
  • New Tisza River bypass bridge to be built at Szolnok, Hungary
    June 28, 2019
    Hungary will soon tender for a new bypass bridge over the Tisza River near Szolnok at a cost of around €77 million. Laszlo Mosoczi, state secretary of the Ministry of Innovation and Technology, said a tender for the planning works is to be called in the autumn with a winner announced in early 2020. The entire project could take five or six years. Szolnok, a town of 72,000 in the Great Hungarian Central Plain 100km east-southeast of the capital Budapest, already has a continuous beam St. Stephen's Brid
  • Breakthrough on Slovakia’s D1 tunnel near Zilina
    December 12, 2016
    Workers in Slovakia have broken through the first of two passages in a tunnel near Zilina as part of an 11km D1 highway project. Breakthrough of the second passage of the tunnel on the section Hricovske Podhradie-Lietavska Lucka will likely be in January. Around 80m are still to be bored, according to a report in the Slovak Spectator on-line newspaper. Zilina is in northwestern Slovakia, around 200km from the capital Bratislava and close to the Czech and Polish borders. Juraj Valent, head of the Na