Skip to main content

Czech tenders for D6 section near Karlovy Vary

The Petrohrad-Lubenec section includes several bridges with work starting by the end of the year for completion in 2026.
By David Arminas June 7, 2023 Read time: 2 mins
The spa city of Karlovy Vary, with around 50,000 inhabitants, is along the D6 motorway (image © Ronstik/Dreamstime)

The Czech Republic has tendered for construction of a 12km section of the D6 motorway in Karlovy Vary worth around €208.63 million.

Karlovy Vary, with around 50,000 inhabitants, is about 106km west of the capital city Prague. It lies at the confluence of the Ohře with the Teplá and Rolava rivers. The national road and motorway directorate RSD that the Petrohrad-Lubenec section includes several bridges with work starting by the end of the year for completion in 2026.

The D6, when completed, will go from Prague through Karlovy Vary and Cheb to the border with Germany. Its first segment was opened in 1980s.

Meanwhile, the government will start looking for a concessionaire for the D35 motorway project in the third quarter of this year when the qualification round for the project will be announced. The two longest missing sections of the motorway will be financed and built by the private sector as part of the public-private project. Cost of the PPP project is expected to come in at around €1.35 billion. Work is due to be completed in 2027.

Last month it was reported that a year after the start of construction, the Czech Republic’s first and only road public-private partnership is on schedule for opening in early 2025. Since 2021, VINCI Highways has led ViA SALis, the consortium for constructing and operating the 32km-long D4 Via Salis. The motorway will link Příbram in central Bohemia to Písek, southern Bohemia. ViA SALis is a 50/50 venture between VINCI and Meridiam.

 

Related Content

  • VINCI increases stake in Greek bridge concession
    November 29, 2022
    VINCI has increased its stake in a key Greek bridge concession.
  • Warm mix use in the US and Czech Republic is strong
    May 20, 2014
    The Czech Republic has seen its first ever use of warm mix produced using additive Evotherm - and a survey carried out in the US shows that warm mix is still on the rise there - Kristina Smith reports The troubled Blanka Tunnel in Prague will see the Czech Republic’s first ever use of Evotherm warm mix asphalt (WMA) technology. The 6km tunnel is the longest urban motorway tunnel in Europe and will take the north-west section of the city ring road below ground. Designed as dual carriageway throughout w
  • LagoonHull project put on hold
    February 8, 2023
    The plan by the UK city of Kingston upon Hull is to transform the city centre and river frontage running from the 2.2km-long, single-span suspension Humber Bridge.
  • Financing model confirmed for German Autobahn
    June 27, 2016
    The refinancing package for Germany’s A8 Autobahn has now been formalised. The section of the A8 runs between Ulm and Augsburg in the south of Germany and is operated by concession firm Pansuevia, a 50:50 partnership between HOCHTIEF and STRABAG. The 58 km section of the A8 between Ulm and Augsburg was opened to traffic on schedule in September 2015 after four years of construction. PANSUEVIA designed, financed, and carried out the widening of the section to six lanes and took over maintenance and operation