Skip to main content

Czech road authorities to use laser scanning of highways to manage maintenance

In the Czech Republic the road authorities are looking to address quality issues that have caused problems on the country’s roads and highways. The Czech Roads and Motorways Directorate (RSD) plans to check the quality of highways using vehicle-mounted scanning laser technology. This will allow RSD to launch repairs before potholes are formed. It is estimated that costs of the repairs will be cut by 30%. RSD tried a similar method of scanning in 2006 but the project was suspended because of a lack of fundin
April 10, 2012 Read time: 1 min
RSSIn the Czech Republic the road authorities are looking to address quality issues that have caused problems on the country’s roads and highways. The 4785 Czech Roads and Motorways Directorate (RSD) plans to check the quality of highways using vehicle-mounted scanning laser technology. This will allow RSD to launch repairs before potholes are formed. It is estimated that costs of the repairs will be cut by 30%. RSD tried a similar method of scanning in 2006 but the project was suspended because of a lack of funding.

For more information on companies in this article

Related Content

  • Virginia highway toll - first of many?
    February 24, 2012
    In the US state of Virginia, the Governor Robert McDonnell is suggesting a new toll on Interstate 95 to help pay for road repairs.
  • A new tolled highway brings change for Austin, Texas
    February 10, 2020
    A new highway section in Austin, Texas marks a major departure for the southern US city
  • TransCore wins White Plains adaptive signal control system contract
    April 26, 2012
    TransCore wins White Plains adaptive signal control system contract. The city of White Plains in New York is deploying a new SCATS-based adaptive traffic signal control system from TransCore that will collect real-time information and then adjust signal timing parameters on a cycle-by-cycle basis on one of the city's major arterials.
  • D8 highway in Czech Republic delayed
    September 19, 2013
    Completion of the final stretch of the D8 highway in the Czech Republic will be delayed. The 4.7km section of highway in the Czech region of Usti Nad Labem Oldrich Bubenicek will not be built by 2015 as planned originally. A landslide that occurred near Litochovice in June 2013 is the reason for the delay. Additional geotechnical surveys now have to be carried out before work can commence to to repair the damage cause by the landslide. It is possible that the results of the survey work will show that the ro