Skip to main content

Colas drives measures to improve safety in Area 7 workzones

A pilot scheme in the United Kingdom by Colas and Solar and Electric Gates (S&EG) is using a new automatic gate to help protect operatives in Area 7 work zones. The Readi-Guard has been developed for the joint venture A-one+, led by infrastructure contractor Costain. Colas and S&EG joined forces to engineer the gate system, which opens horizontally to allow authorised vehicles into work areas. It safeguards workers because manual gate operation is not required. “The TM Access Gate is a well thought
December 11, 2015 Read time: 2 mins
A pilot scheme in the United Kingdom by Colas and Solar and Electric Gates (S&EG) is using a new automatic gate to help protect operatives in Area 7 work zones.

The Readi-Guard has been developed for the joint venture 2316 A-one+, led by infrastructure contractor 2319 Costain.

184 Colas and S&EG joined forces to engineer the gate system, which opens horizontally to allow authorised vehicles into work areas. It safeguards workers because manual gate operation is not required.

“The TM Access Gate is a well thought-out solution to an issue that poses considerable risk to our workforce and the wider traffic management community,” said Ryan Wood, technical manager at Colas.

“Working with S&EG we have been able to develop a system that eliminates exposure to live traffic in situations when operatives are required to open works accesses. It is designed for ease of deployment and use in short-term works but is equally suited to longer term work sites.

"The innovation is important for the partners of the joint venture A-one+ because of its highways maintenance work in England. Two years ago, A-one+ won a two-year extension to its five-year managing agent contract, awarded the then Highways Agency, now called 8100 Highways England.

Under the €81 million contract that ends in June next year, A-One+ is carrying out operational and routine maintenance services and highway improvements to the motorways and trunk roads in the East Midlands region of England.

For more information on companies in this article

Related Content

  • Rajasthan Mega Highways boost trade, tourism
    April 12, 2012
    Rajasthan is one of the most favoured tourist destinations of India for both domestic and international traffic on account of its rich array of historical forts, palaces, art and culture. In terms of area, Rajasthan is the country's largest state. Its size and strategic location means that it is traversed by substantial traffic linking the neighbouring states to the north and south. The National Highway (NH) road corridors currently accommodating this traffic are the NH-8, NH-11, NH-12, NH-14 and NH-1
  • Motorway's tricky cable installation
    February 6, 2012
    The UK is now benefiting from the installation of sophisticated automated traffic management equipment and information signs on its motorway network. But with heavy traffic volumes on these roads, novel techniques have had to be implemented. One such operation, organised by client The Highways Agency and its consulting engineer A.One+, has recently been underway on the M56 motorway between Junctions 9 and 16 in north-west England under the Triple Package Advanced Works designation. To minimise traffic distu
  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h
  • BAUER mobilises rigs for UK’s A19/A1058 coast road piling works
    April 10, 2017
    In north-east England, work is underway to create an improved A19/A1058 Coast Road junction. The £75m scheme in the city of Newcastle involves the upgrade of a roundabout to an ambitious three-level interchange. The Sisk Lagan joint venture, the main contractor, called upon Bauer Technologies, to complete the piling works for critical structures. Bauer’s parent company, Bauer Spezialtiefbau, is a global construction company specialising in complex and specialist foundation works, with its head office in