Skip to main content

Bechtel-Enka win North Macedonia deal

The US-Turkish joint venture will build four sections of the European Corridors VIII and X in the Balkan country north of Greece.
By David Arminas March 21, 2023 Read time: 2 mins
The North Macedonian capital Skopje is on European Route VIII (image © Salahudin/Dreamstime)

North Macedonia has signed a €1.3 billion deal with US-Turkish joint venture Bechtel-Enka for construction of four sections of the European Corridors VIII and X.

The total length of construction will be around 110km. The sections are Tetovo-Gostivar, Gostivar-Bukojchani, Trebenishte-Struga-Kjafasan and Prilep-Bitola, Ejup Rustemi, according to North Macedonia's Public Enterprise for State Roads.

Corridor VIII is an east-west route connecting Albania's Adriatic port of Durres to the Bulgaria's Black Sea port of Varna via North Macedonia. Corridor X runs from Austria's Salzburg in the north to Greece's Thessaloniki in the south.

North Macedonia recently sent out an Invitation for Expressions of Interest for Construction Supervision For Road Corridor VIII Kichevo-Bukojchani section.

In January, the state highways agency signed a €9.7 million contract with the Macedonian  construction company Granit for work on the A4 motorway which connects the capital Skopje to the border with Kosovo. Work includes widening of an existing road from the Kosovo border to the village of Blace village and construction of a part of the A4 motorway to connect the village with another local road.

Road construction business Granit, based in Skopje, was a state-owned company until it was privatised in 1996. The company owns several concrete and asphalt plants as well as stone quarries.

For more information on companies in this article

Related Content

  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost
  • Højgaard and BESIX win Nordhavn Tunnel work
    September 16, 2022
    The €349.6 million Nordhavnstunnel contract in the capital Copenhagen was awarded by the Danish Road Directorate / Vejdirektoratet.
  • Land acquisition delays the start of Bratislava's orbital road
    September 25, 2017
    Land acquisition issues have stalled the start of construction of Bratislava’s orbital road by up to eight months. Work could begin this autumn, according to a report by the Slovak Spectator, because the government is working on laws that would allow construction before all land is acquired.
  • Italy's new southern highway route
    May 13, 2021
    An important new highway route is currently under construction in South Italy