Skip to main content

UK's managed motorways scheme improves journey times

"One of the most important challenges for the Highways Agency (HA) is the management of Britain's motorways to improve traffic flows, reduce congestion, cut travel times and maintain better local air quality. But as traffic volumes increase, the HA is constantly looking for more economical, effective and sustainable methods of managing the country's motorways. "The Managed Motorway concept uses detectors to measure congestion, control software to display mandatory speed signs and an enforcement system to
April 11, 2012 Read time: 2 mins
Marc Roberts, Peek Traffic business development director

Marc Roberts, 3314 Peek Traffic business development director

"One of the most important challenges for the 2309 Highways Agency (HA) is the management of Britain's motorways to improve traffic flows, reduce congestion, cut travel times and maintain better local air quality. But as traffic volumes increase, the HA is constantly looking for more economical, effective and sustainable methods of managing the country's motorways.

"The Managed Motorway concept uses detectors to measure congestion, control software to display mandatory speed signs and an enforcement system to ensure drivers comply with the temporary speed limits. Peek has provided the detector technology through our Motorway Incident Detection and Signalling (MIDAS) products, the control software with our HA Traffic Management System (HATMS) and Hard Shoulder Management System (HSMS), as well as developing and installing the Highways Agency Digital Enforcement Camera System (HADECS).

"The enforcement system was granted UK Home Office Type Approval following a period of rigorous testing by the Home Office Scientific Development Branch (HOSDB) in conjunction with the Police. Images are collected digitally by the outstation camera units and automatically transmitted to an in-station in a secure encrypted format using Advanced Encryption Standard (AES).

"The Managed Motorway system permits the use of the hard shoulder at times of congestion to allow more vehicles to use the road. Compliance with the variable mandatory speed limits improves safety on the road and improves journey time reliability for the motorists."  Traffic control technology from Peek Traffic, part of the Holland-based Imtech Group, is used in the M6 Birmingham Box Managed Motorways Scheme (BBMM).

For more information on companies in this article

Related Content

  • Highways England on track with smart motorway upgrade near Cheshire
    September 28, 2018
    A 20tonne gantry – the biggest single structure under a major motorway upgrade in England - has been hoisted into place in Cheshire county.
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • Speed management on freeways
    June 22, 2012
    Characteristics of traffic speed and flow in managed freeways - *Dr Adrian Withill. In order to maximise the benefits of existing infrastructure, in terms of reduced delays and increased safety, many governments have recently been introducing projects that measure traffic speed and flow and automatically introduce advisory or mandatory speed limits. Such schemes tend to offer relatively quick wins at relatively lower capital costs than traditional highway construction. In light of the current world economy,
  • Installation underway of first UK M4/M5 ‘superspan’ gantries
    July 4, 2012
    The installation is underway of the first superspan gantries on the M4/M5 managed motorway scheme. The existing gantries and infrastructure were successfully removed last month while the new steel gantries were being constructed, fitted-out and tested at a dedicated facility located near junction 17 of the M5, before being delivered to the works site. A total of 33 new overhead gantries, a number of which span 50m and weigh over 30tonnes, will be installed along the new managed motorway section up until T