Skip to main content

Key toll road project in Indonesia

Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.
February 23, 2012 Read time: 1 min
Indonesia toll projects Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.

Related Content

  • Indonesia’s new toll road link
    March 25, 2019
    Plans are moving ahead in Indonesia for the construction of the Kuala Tanjung toll road project. Financing has been secured for an 80km stretch of the route. This stretch will run from Terbanggi Besar, through Pematang Panggang to Kayu Agung and will cost around US$552.3 million to build. The project for the Kuala Tanjung toll road includes a number of complext and costly elevated sections, between: Krian-Legundi, Bunder and Manyar (KLBM); Jakarta and Cikampek II Elevated; Batang and Semarang; Jakarta and C
  • Indonesia pushes ahead with highway projects
    December 11, 2012
    The Indonesian Government is on track with its schedule of building new highway links to increase connectivity. The Indonesian Government looks likely to require investment of US$20 billion for infrastructure projects in 2013, but as this exceeds its own resources, private investment and concession packages will help fill the gap. The Ministry of Transportation established the Indonesian Economic Development Acceleration and Expansion Masterplan that set out a template for the projects, many of which are du
  • Indonesia’s toll road network is expanding
    August 17, 2018
    Indonesia continues to expand its toll road network, with major routes being built and opening to traffic. The toll road firm Jasa Marga will expand its network from 787km to 1,000km by the end of 2018. Four key sections of toll road will be complete at the end of 2018, linking Gempol and Pasuruan, Salatiga and Kartasura, Wilangan and Kertosono and Batang with Semarang.
  • Waskita Karya seeks loan for Pejagan-Pemalang toll road on Java
    January 12, 2015
    Indonesian state-owned construction firm Waskita Karya will seek a bank loan of US$338 million for its work on the Pejagan-Pemalang toll project in central Java island. The project is being managed by Pejagan Pemalang Toll Road, a subsidiary of Waskita Karya. Waskita company secretary Antonius Yulianto Nugroho said the firm has enough cash resources to cover a quarter of its financial commitment on the project and is targeting bank loans to cover the other 75%. Waskita Karya plans to carry out a bond