Skip to main content

WJ to improve Contramark system

An update is coming for the Contramark II temporary road stud installation system.
By David Arminas July 21, 2020 Read time: 2 mins
Hitting the mark: temporary tape markings with WJ’s Contramark II road safety system

UK-based road works safety specialist WJ is set to deliver this year what it says will be the first accelerated-wear testing device for road studs.

The company also said that it will be updating its Contramark II temporary road stud installation system during the year. Improvements, too, have been made to its Hydroblast line removal process and the company’s Captive Shot Retexturing equipment.

Company executives revealed their plans during a safety conference in southwest England earlier this year.

The Contramark Fully Automated Surface Applied Temporary Road Stud System consists of temporary tape markings and “stick-on” road studs.

“It is still very frustrating that there is no live test bed in the UK where we can check performance of our new ideas,” said Martin Webb, operations director at WJ. “Usually we have to go to Belgium for road trials, but this latest investment is a step change for testing road studs as well as other highway maintenance and traffic products. The equipment will be initially for our own use but ultimately made available for anyone in the highways sector to utilise as well.”

WJ has developed an LGV Driver Performance Monitoring and Reward Programme. Speeding, harsh cornering, severe braking, rapid acceleration and stop-sign violations are monitored on a system within the vehicle’s cab. From this information, WJ produces a league table for drivers in each of its depots with the top of the league receiving a cash prize every month and then again at the end of the year.

More information is available from the website of WJ.

For more information on companies in this article

Related Content

  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c
  • Better asset management will reduce costs and improve efficiency
    August 22, 2013
    The FEHRL Infrastructure Research Meeting 2013 (FIRM 2013) raised key issues in transport innovation The key theme for FIRM 13 was advanced and innovative construction and maintenance, highlighting the importance of efficient asset management. Infravation, or infrastructure innovation, was another focus area for the event. Joris Al, FEHRL president said, “We aim to bring interested parties together. We’ve decided to build on existing knowledge rather than starting with front edge technologies and working
  • Major gains in concrete plant technology
    June 28, 2013
    There is a great deal of innovation across the concrete plant, pump and truck mixer sector. Guy Woodford looks at what some of the sector’s biggest names are offering. CIFA managing director Davide Cipolla believes the Zoomlion-owned Italian firm has “not reached the limit” of what it can offer customers, thanks to a significant investment in research and development. Speaking about a US$2.57 million-a-year (€2million) R&D investment in CIFA and some Zoomlion products over the last five years Cipolla, who i
  • The US FAST Act: a job left unfinished
    April 4, 2016
    US roads and bridges are crumbling at an alarming rate as state governments wring their hands over the increasingly scarce money for repairs. Enter the FAST Act. But is it enough? US state transportation department officials, as well as highway contractors and operators, breathed a sigh of relief in December. For months the highways infrastructure sector waited anxiously to see where the necessary money for road projects would come from. For several years, the Highways Trust Fund – the usual way of paying f