Skip to main content

WJ to improve Contramark system

An update is coming for the Contramark II temporary road stud installation system.
By David Arminas July 21, 2020 Read time: 2 mins
Hitting the mark: temporary tape markings with WJ’s Contramark II road safety system

UK-based road works safety specialist WJ is set to deliver this year what it says will be the first accelerated-wear testing device for road studs.

The company also said that it will be updating its Contramark II temporary road stud installation system during the year. Improvements, too, have been made to its Hydroblast line removal process and the company’s Captive Shot Retexturing equipment.

Company executives revealed their plans during a safety conference in southwest England earlier this year.

The Contramark Fully Automated Surface Applied Temporary Road Stud System consists of temporary tape markings and “stick-on” road studs.

“It is still very frustrating that there is no live test bed in the UK where we can check performance of our new ideas,” said Martin Webb, operations director at WJ. “Usually we have to go to Belgium for road trials, but this latest investment is a step change for testing road studs as well as other highway maintenance and traffic products. The equipment will be initially for our own use but ultimately made available for anyone in the highways sector to utilise as well.”

WJ has developed an LGV Driver Performance Monitoring and Reward Programme. Speeding, harsh cornering, severe braking, rapid acceleration and stop-sign violations are monitored on a system within the vehicle’s cab. From this information, WJ produces a league table for drivers in each of its depots with the top of the league receiving a cash prize every month and then again at the end of the year.

More information is available from the website of WJ.

For more information on companies in this article

Related Content

  • High quality paving has been achieved at the Silverstone race track
    April 6, 2020
    Contractor Tarmac helped provide a high-quality surface for the UK’s famous Silverstone F1 racetrack, with the help of sophisticated technology from Topcon Positioning and Volz Consulting
  • Sorting out site comms
    August 9, 2021
    With the radio spectrum quickly filling up, signal congestion can hinder reliability and site communications. Darren Hudson, senior projects manager of Traffic Group Signals in the UK, explains
  • Strategic road plan announced in the UK
    May 23, 2023
    A statement from National Highways in the UK said the emphasis is on boosting the economy “in an environmentally sustainable way” up to 2030 and beyond.
  • Defining the standards for asphalt road surfaces
    February 20, 2012
    Materials used to construct roads must meet defined standards to offer a variety of solutions including durability, smoothness and long life. The need for the regular testing of materials used in highway construction is now a must on all projects. It is essential to make sure that the materials used in producing roads meet defined standards and offer durability, smoothness and long life.