Skip to main content

UK’s M3 motorway gets first orange emergency area

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
August 1, 2017 Read time: 2 mins
Safer with an orange: Emergency Refuge Areas using QMS Type 1 HyperGrip system

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England.

The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to 8100 Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Work on the officially-called Emergency Refuge Areas is being done by 8037 WJ in collaboration with maintenance contractors 1146 Balfour Beatty and 184 Colas.

Smart motorways relieve congestion and improve journey times by making the hard shoulder available for use at busy periods. On some schemes, it is permanently converted into a traffic lane, known as All Lane Running.

Spaced emergency refuge areas - ERA - are provided roughly every 2.5km and are clearly marked with blue signs featuring an orange SOS telephone symbol.

This safety upgrade, using QMS Type 1 HyperGrip system, has been delivered on the 21.5km smart motorway scheme, which covers the M3 from junctions 2-4a in Hampshire and Surrey counties. Two emergency refuge areas were completed as z trial and now all ERA’s on the scheme will be afforded the same enhancement.

It is planned now to apply this coloured system on all ERA’s throughout the scheme with other smart motorway contracts expressing interest.

The change is part of an ongoing review into the design and spacing of emergency areas on smart motorways, said Jim O’Sullivan, Highways England chief executive.

Quality Marking Services
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.qmarkings.co.uk Quality Marking Services Website Link false http://www.qmarkings.co.uk/ false false%>

For more information on companies in this article

Related Content

  • IronPlanet shows its latest features at INTERMAT 2012
    February 6, 2012
    The IronPlanet online marketplace for used heavy equipment will be updating INTERMAT visitors about its latest developments, including a smartphone application that allows users to search and bid wherever they are.
  • Benninghoven reveals recycling innovation
    January 6, 2017
    Benninghoven has a rich history of innovation in asphalt plant technology. Speaking at bauma 2013, the German company’s managing director Bernd Benninghoven said the firm had developed and were trialling a new system for recycling. “In order to save valuable resources we have developed a special machine that can handle big lumps of recycling material which then separates it back into its own original structure,” he explained. “This then allows you to add as much recycling as possible which is important.
  • Benninghoven reveals recycling innovation
    April 30, 2013
    Benninghoven has a rich history of innovation in asphalt plant technology. Speaking at bauma 2013, the German company’s managing director Bernd Benninghoven said the firm had developed and were trialling a new system for recycling. “In order to save valuable resources we have developed a special machine that can handle big lumps of recycling material which then separates it back into its own original structure,” he explained. “This then allows you to add as much recycling as possible which is important.
  • Anaconda shows off screener and conveyor
    February 26, 2013
    Anaconda Equipment International will have two products on display at its first bauma: the DF410 tracked screener and a TR60 18m track-mounted stockpiling conveyor. The DF410 entry level screener can screen and stockpile up to 250tonnes/hour of material into three sizes, and is said to be ideal for those restricted by working area in urban areas.