Skip to main content

UK’s M3 motorway gets first orange emergency area

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
August 1, 2017 Read time: 2 mins
Safer with an orange: Emergency Refuge Areas using QMS Type 1 HyperGrip system

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England.

The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to 8100 Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Work on the officially-called Emergency Refuge Areas is being done by 8037 WJ in collaboration with maintenance contractors 1146 Balfour Beatty and 184 Colas.

Smart motorways relieve congestion and improve journey times by making the hard shoulder available for use at busy periods. On some schemes, it is permanently converted into a traffic lane, known as All Lane Running.

Spaced emergency refuge areas - ERA - are provided roughly every 2.5km and are clearly marked with blue signs featuring an orange SOS telephone symbol.

This safety upgrade, using QMS Type 1 HyperGrip system, has been delivered on the 21.5km smart motorway scheme, which covers the M3 from junctions 2-4a in Hampshire and Surrey counties. Two emergency refuge areas were completed as z trial and now all ERA’s on the scheme will be afforded the same enhancement.

It is planned now to apply this coloured system on all ERA’s throughout the scheme with other smart motorway contracts expressing interest.

The change is part of an ongoing review into the design and spacing of emergency areas on smart motorways, said Jim O’Sullivan, Highways England chief executive.

Quality Marking Services
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.qmarkings.co.uk Quality Marking Services Website Link false http://www.qmarkings.co.uk/ false false%>

For more information on companies in this article

Related Content

  • 3M funds scholarships through Visibly Safer Work Zones Project
    April 28, 2015
    3M, a maker of workzone safety products, has again donated US$20,000 to the 3M Visibly Safer Work Zones Project. Now in its fourth year, the project supports programmes of the American Traffic Safety Services Foundation (ATSSF) and the American Road and Transportation Builders Association Transportation Development Foundation (ARTBA-TDF) that provide scholarships for children of roadway construction workers killed or permanently disabled on the job. To date, the project has donated $50,000 to the ATSSF’s
  • The new Doosan large excavators offer increased performance
    January 28, 2013
    Weighing in at 42-43.3tonnes depending on specification, the new Doosan DX420LC-3 excavator is Stage IIIB/Tier 4 Interim compliant and offers significant benefits over the model it replaces. Improvements include an increase in power, boosting overall productivity and the machine can be used in heavy-duty applications such as earthmoving, demolition and quarrying.
  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
  • Trimble introduces grade control simulator for bulldozer operator training
    January 6, 2017
    Trimble used bauma 2013 to introduce a construction grade control simulator for the specific purpose of training bulldozer operators. The simulator enables Sitech Technology dealers to deliver training on the GCS900 grade control system in a safe and realistic environment, without removing a bulldozer from production duties to carry out operator training. Trimble’s grade control simulator features fully interactive joysticks, a motion platform, decelerator and CB460 control box, enabling bulldozer operators