Stopping power: REBLOC’s 120AS_7.5 barrier

The highest containment level H4b offers the best possible protection by safely redirecting errant vehicles and preventing them from breaking through the barrier upon impact. The H4b barrier restrains the impact of a 38tonne truck driving at 65km/h (TB81, according to EN 1317-1/2).
January 13, 2021 Read time: 1 min

The highly versatile REBLOC 120 series can be installed for long-lasting H4b protection on the central reservation and along the verge. Additionally, the product is tested for installation on bridges.

The REBLOC 120AS_7.5 barrier with performance level H4b/W2 has already been installed on several motorways in large scale for the protection of critical bridge structures, such as bridge piers in the median.

The exceptionally low working width W2 means that the required space does not exceed 0.8m and reflects the very low dynamic deflection during impact. Valuable space can be maintained and sufficient width of traffic lanes is ensured. A key feature is the system height of 1.2m which offers effective glare protection.

REBLOC Concrete Barriers ensure a secure and fast installation at any time of the year, day or night, and, above all in any weather. The integrated, innovative coupling does not contain any loose parts. This not only enhances safety and speed of installation but also prevents unauthorised removal and vandalism. REBLOC safety barriers are fully tested to EN1317.

For more information on companies in this article

Related Content

  • Emergent markets key for formwork sector growth
    May 21, 2014
    Central and south-east Europe are hotbeds for new highway infrastructure projects utilising cutting-edge formwork solutions, while a number of leading formwork manufacturers are also looking at emergent markets for growth. Guy Woodford reports Travelling between Hungary’s capital Budapest and Southern Dalmatia now takes less time thanks to the Pan-European Corridor Vc – European route 73. Numerous tunnels and bridges are erected along the 397km stretch of the European route 73 through Bosnia owing to the
  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.
  • Double sided duty
    February 13, 2012
    Highway Care is now offering double-sided P4 terminal that is specially developed for the UK road network. The Xtension 110 Double-sided P4 Terminal is said to be the only approved double-sided P4 terminal available for use in the UK market.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s