Stopping power: REBLOC’s 120AS_7.5 barrier

The highest containment level H4b offers the best possible protection by safely redirecting errant vehicles and preventing them from breaking through the barrier upon impact. The H4b barrier restrains the impact of a 38tonne truck driving at 65km/h (TB81, according to EN 1317-1/2).
January 13, 2021 Read time: 1 min

The highly versatile REBLOC 120 series can be installed for long-lasting H4b protection on the central reservation and along the verge. Additionally, the product is tested for installation on bridges.

The REBLOC 120AS_7.5 barrier with performance level H4b/W2 has already been installed on several motorways in large scale for the protection of critical bridge structures, such as bridge piers in the median.

The exceptionally low working width W2 means that the required space does not exceed 0.8m and reflects the very low dynamic deflection during impact. Valuable space can be maintained and sufficient width of traffic lanes is ensured. A key feature is the system height of 1.2m which offers effective glare protection.

REBLOC Concrete Barriers ensure a secure and fast installation at any time of the year, day or night, and, above all in any weather. The integrated, innovative coupling does not contain any loose parts. This not only enhances safety and speed of installation but also prevents unauthorised removal and vandalism. REBLOC safety barriers are fully tested to EN1317.

For more information on companies in this article

Related Content

  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Energy absorbing safety barrier
    March 9, 2012
    Barrier Systems says that its new tensioned barrier offers high energy absorbing capabilities in head-on collisions. The company says that this is because the X-Tension technology is a tension-based solution rather than compression-based. The new range delivers good performance in these applications, as energy is absorbed with resistance at the impact head rather than being transferred down the rail as occurs with other systems. Even high-angle (15° during testing) impacts on the nose resulted in the vehicl
  • Work zone safety solution on busy world highways
    December 3, 2013
    Globally renowned highway work zone safety solution manufacturers have been providing some of their latest systems to protect roadworkers and motorists on high volume traffic highways. Guy Woodford reports Versilis has provided one of its state-of-the-art work zone safety solutions during the rehabilitation of North America’s busiest highway. The Canadian road safety product innovator and manufacturer was retained by the Ministry of Transportation of Ontario (MTO) to install automated traffic control
  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e