Skip to main content

Stimsonite Click Stud saves on in-situ replacement time

Over the past four years, there have been nine road worker deaths on the Highways Agency network in the UK. Statistics such as these are drivers for road authorities to improve health and safety for the workforce on the network. It takes just seconds to replace a Stimsonite Click Stud reflector compared to an average time of eight minutes to remove and replace a conventional bonded road stud. This greatly benefits the Highways Agency by reducing the exposure of road workers to traffic. Conventional
April 29, 2015 Read time: 2 mins
Over the past four years, there have been nine road worker deaths on the 2309 Highways Agency network in the UK. Statistics such as these are drivers for road authorities to improve health and safety for the workforce on the network.

It takes just seconds to replace a Stimsonite Click Stud reflector compared to an average time of eight minutes to remove and replace a conventional bonded road stud. This greatly benefits the Highways Agency by reducing the exposure of road workers to traffic.

Conventional reflective road studs are typically assembled using adhesive to fix the reflector in the housing. The bonded assembly provides good durability and working life for the reflector. However, when the reflector needs to be replaced, the bonding method of assembly makes the replacement process time consuming and expensive. Removing the old reflector, cleaning the recess and refitting with adhesive is laborious and time-consuming. Extended road closures are required causing unnecessary disruption and risk to the work force.

The novel Stimsonite Click Stud has a patented fixing system that allows rapid removal and replacement of the reflector in-situ in the road surface. Due to the reduced traffic management costs as well as the fast, cost-effective reflector replacement, the Stimsonite Click Stud has a lower whole life cost compared to any other product currently on the market.

At times of surface dressing the reflector can be removed and clicked back in place once the work is completed. Labour and traffic management costs are estimated to be two thirds of that of conventional units, while traffic disruption is reduced and lane closures will be shortened. The reflector can also be removed and replaced with blanks during roadworks when there are lane movements or priority change, to help avoid road user confusion with lane delineation. Once the works are complete the process can be quickly reversed, saving time and money and these units are already being used in the UK on the M25, A14 and M74.

For more information on companies in this article

Related Content

  • Nuphalt’s novel patching system offers fast and efficient road repairs
    September 2, 2014
    Fast, efficient and long-lasting repairs are claimed for the heating system developed by the Nu-Phalt Group Developed in the UK, the innovative Nu-Phalt pothole patching system equipment is now being widely used by various local authorities for road repairs. But this technology is also being employed internationally, with key sales in parts of Eastern Europe and India.
  • Latest bitumen mixes improve roads, reduce noise
    February 14, 2012
    Special bitumen mixes and machines are capable of improving the service life of roads and reducing noise. Mike Woof and Patrick Smith report. The need to improve traffic flow in an important part of the City of Poznan, Poland, led to the decision to build a new 1.13km long dual carriageway.
  • Road safety gain for UK in 2013
    June 26, 2014
    The UK’s Department for Transport (DfT) reveals that the road fatality rate for 2013 was the lowest since records began in 1926. The data shows that 1,713 people died on the UK’s road network in 2013, around half that of the figure recorded for the year 2000. This reveals an on-going improvement in road safety levels. The DfT statistics show that in 2013, 21,657 people were seriously injured in road crashes, while the total number of casualties of all severities stood at 183,670. Car occupant fatalities in
  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the