Skip to main content

Noise and crash barriers, high strength protection

HOLGATE INFRASTRUCTURE & Motorway Services has supplied vehicle restraint systems and noise attenuation panels to major highway upgrade projects in the UK. The firm has installed Vetex crash barriers and high performance aluminium noise barriers on the M50 Linton upgrade for Alu Griffiths and Amey. Holgate has also supplied the noise barrier package on the M74 Glasgow motorway extension. Interlink M74 Joint Venture, comprising of Balfour Beatty Civil Engineering along with equal joint venture partners Morga
February 15, 2012 Read time: 2 mins
Noise attenuation panels from Holgate are being installed on the M74 project close to Glasgow in the UK
HOLGATE INFRASTRUCTURE & Motorway Services has supplied vehicle restraint systems and noise attenuation panels to major highway upgrade projects in the UK. The firm has installed Vetex crash barriers and high performance aluminium noise barriers on the M50 Linton upgrade for Alu Griffiths and Amey. Holgate has also supplied the noise barrier package on the M74 Glasgow motorway extension. Interlink M74 Joint Venture, comprising of 1146 Balfour Beatty Civil Engineering along with equal joint venture partners Morgan EST, Morrison Construction and Sir Robert McAlpine, are responsible for the contract worth €512 million (£445 million) to design and construct an 8km extension to the M74. This extension will reduce congestion on the busiest stretch of the M8 through Glasgow.

Holgate is providing 12,000m2 of products to reduce noise along this built up route. The product selected was the Holgate High performance Aluminium absorbent system.

Holgate completed a full re-design of the project and the contract also includes the side fixing of reinforced transparent acrylic barriers from to the outside of seven bridge structures.

The contract is the largest single noise barrier project in the UK at present and sets a new standard in noise barrier specification in the UK which is consistent with best practice throughout Europe. Also in Scotland Holgate has recently been awarded the crash barrier contract for the A9 Crubenmore which requires 7.5km of Vetex barrier systems together with P4 terminals.

For more information on companies in this article

Related Content

  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many
  • Cleveland Bridge is all decked out on the England’s A14 scheme
    June 4, 2019
    As part of Highways England’s A14 upgrade project from Cambridge to Huntington, Cleveland Bridge installed two 1,050tonne pre-assembled bridge decks in just 11 hours. Months of detailed planning and client liaison ensured the 47.5m-long bridge decks, each containing 330tonnes of steel and 720tonnes of concrete, were successfully travelled to the site and lowered onto the abutments. On-site civil engineering works were undertaken by the A14 Integrated Delivery Team, a joint venture between Costain,
  • The MBT-1 from Mobile Barriers now protecting workers in the UK
    August 14, 2019
    Two giant US-made 21m-long mobile barriers are now keeping highway maintenance workers safe in England.
  • Balfour Beatty says strong 2024 performance provides momentum into 2025 and 2026
    March 14, 2025
    Balfour Beatty says that it delivered another year of strong operational performance in 2024, which resulted in the group growing earnings, average cash and order book.