Skip to main content

Morelock's 3M sign sheets

Using the latest technology from 3M has helped UK sign-maker Morelock to achieve the new European harmonised standard BS EN 12899:2007 for fixed vertical road traffic signs. The signs also feature the CE mark and use the latest 3M reflective sheeting.
February 7, 2012 Read time: 1 min
Ultra-high visibility is claimed for the new signs thanks to 3M sheeting
Using the latest technology from 152 3M has helped UK sign-maker 2372 Morelock to achieve the new European harmonised standard BS EN 12899:2007 for fixed vertical road traffic signs. The signs also feature the CE mark and use the latest 3M reflective sheeting.

This new standard is very thorough and includes an assessed factory production control (FPC), in-line test, calculation of post and foundation details to comply with wind loading and independent product testing.

Meanwhile Morelock's own branded substrate material, MPGRP, was also submitted to for product initial type testing, and passed.

For more information on companies in this article

Related Content

  • Expanding the Panamericana Oestae Highway in Panama
    November 3, 2023
    Expansion of the Panamericana Oeste highway is an infrastructure project that will help guarantee the future of Panama - Mauro Nogarin writes
  • WJ’s Guardian stud machine to be launched in Europe
    February 23, 2018
    Stud placement just got a lot safer for road operatives in continental Europe thanks to a collaboration between the UK’s WJ Group and Belgium’s ACB. UK-based WJ Group and ACB formed their joint venture company, ACBWJ around 2006 to share product knowledge, marketing and research into thermoplastics and road markings. ACBWJ will officially launch WJ’s Guardian stud placement vehicle into the European market at the Intertraffic exhibition in Amsterdam from March 20-23.
  • Crushing efficiency for the aggregates sector
    December 11, 2020
    The aggregates sector is benefiting from the introduction of new high production technology
  • Stirling Lloyd in the fast lane: Waterproofing Warsaw’s Rowecki Bridge
    January 19, 2016
    Warsaw’s General Stefan Rowecki Bridge, or the Grota Bridge, is the second largest in the Polish capital and, as part of the Trasa Toruska expressway, it is the busiest. The structure, which opened in 1981, handles 150,000 cars daily, so repairs were always going to be tricky if minimal disruption to traffic was to occur. The steel orthotropic deck consists of two structurally independent parts – each with four traffic lanes. This meant that pedestrians and cyclists were restricted to two very narrow track