Skip to main content

Matador4 Heald in high regard

Heald says its Matador4 bollard was fully functional with zero penetration and dispersion after being struck by a 7,500kg truck travelling at 48mph during a recent crash test. The model, comprising two central moving bollards and based on the Matador3, gives a clear opening of just over 4metres. Surface mounted and only needing to be bolted into place, the Matador4 is said by Heald to be ideal for a variety of applications including temporary installations.
June 21, 2012 Read time: 1 min
5976 Heald says its Matador4 bollard was fully functional with zero penetration and dispersion after being struck by a 7,500kg truck travelling at 48kph during a recent crash test.

The model, comprising two central moving bollards and based on the Matador3, gives a clear opening of just over 4metres.

Surface mounted and only needing to be bolted into place, the Matador4 is said by Heald to be ideal for a variety of applications including temporary installations.

A company spokesperson said: “One of the benefits of this new system is the bollard does not lower into the ground so is therefore visible to users at all times making transit extremely safe for the driver and also any passing pedestrians.”

For more information on companies in this article

Related Content

  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Kleemann: Mobile Screen for Coarse Elements MOBISCREEN MSS 802(i) EVO
    February 21, 2023
    More flexibility and efficient on site