Skip to main content

Matador4 Heald in high regard

Heald says its Matador4 bollard was fully functional with zero penetration and dispersion after being struck by a 7,500kg truck travelling at 48mph during a recent crash test. The model, comprising two central moving bollards and based on the Matador3, gives a clear opening of just over 4metres. Surface mounted and only needing to be bolted into place, the Matador4 is said by Heald to be ideal for a variety of applications including temporary installations.
June 21, 2012 Read time: 1 min
5976 Heald says its Matador4 bollard was fully functional with zero penetration and dispersion after being struck by a 7,500kg truck travelling at 48kph during a recent crash test.

The model, comprising two central moving bollards and based on the Matador3, gives a clear opening of just over 4metres.

Surface mounted and only needing to be bolted into place, the Matador4 is said by Heald to be ideal for a variety of applications including temporary installations.

A company spokesperson said: “One of the benefits of this new system is the bollard does not lower into the ground so is therefore visible to users at all times making transit extremely safe for the driver and also any passing pedestrians.”

For more information on companies in this article

Related Content

  • Rebloc’s construction site end terminal
    September 19, 2024

    Rebloc has developed an end-terminal for performance class P2A barriers with an impact severity level A designed specifically for traffic management on construction sites.

    The end terminal has been successfully tested according to ENV 1317-4 and is particularly suitable for use in combination with temporary vehicle restraint systems.

    The company, based in Austria, said that a standout feature of the system is the unanchored setup and the narrow width of only 240mm. The width matches exactly with the width of the connected temporary Rebloc barrier.

  • New JCB World Logistics plant opens
    February 12, 2014
    JCB Chief Executive Graeme Macdonald has officially opened the company’s newest facility in Staffordshire, which has created almost 100 new jobs in just six months. JCB World Logistics took over the former 35,581m² Blue Planet warehouse in Newcastle-under-Lyme in July 2013 and since then almost 80 new warehouse and office staff and 20 drivers have been recruited. In the next two years employment levels are expected to triple to more than 300 as the facility becomes fully operational.
  • BOMAG: road construction with warm mix asphalt
    July 3, 2024
    When it comes to paving and compacting warm mix asphalt (WMA), BOMAG rollers and pavers really come into their own. Well prepared for what’s to come: road construction with warm mix asphalt.
  • Powered two wheeler safety plan for Europe
    November 16, 2015
    A new road safety strategy for powered two wheelers in Europe has been set out jointly following discussions. The results of analysis have been set out in a joint position statement by the bodies FEMA, FIM and FIM Europe. In the draft report FEMA and FIM have identified seven major areas of great importance that are in accordance with the positions of the riders’ organisations in Europe and elsewhere. Key recommendations and statements from the OECD-ITF draft report highlight issues for the safety of powe