Skip to main content

London’s Westminster Council goes for gully offenders

Increasing numbers of blocked road drains and gullies has forced London’s Westminster City Council to take a tough stand with offenders The council maintains 16,500 gullies. Around 95% of a gully’s content is natural and can be recycled: taken away to road contractor FM Conway’s drainage treatment plant. Material is separated into solids, organics and water and reused as aggregates and materials in their wider construction business.
February 8, 2018 Read time: 2 mins
Increasing numbers of blocked road drains and gullies has forced London’s Westminster City Council to take a tough stand with offenders


The council maintains 16,500 gullies. Around 95% of a gully’s content is natural and can be recycled: taken away to road contractor FM 2329 Conway’s drainage treatment plant. Material is separated into solids, organics and water and reused as aggregates and materials in their wider construction business.

But other items cause major blockages that can lead to serious flooding even after manageable rain levels. Since July, FM Conway has surveyed around 200 gullies with CCTV. Objects found include gold jewellery, knives, vehicle number plates and dozens of mobile phones. Notably, the council said that that gullies around building sites are often blocked with commercial waste – such as sand and concrete. Last year street cleansing teams were called to a gully that was bubbling with an unidentified florescent green liquid and a gully near Oxford Street was found blocked by five full sand bags.

Sometimes, as a last resort, cars must be lifted off the street to gain access to a drain – a costly and time-consuming process.

To counter all this, Westminster City Council is looking to ensure licensed building sites are covering all the costs of cleansing road gullies next to their premises. A sewerage surcharge could be the answer. It would be incorporated into structural licence fees paid by contractors and be based on the number of gullies likely to be affected by the company’s works. It would cover a charge for the council’s contractor and staffing costs associated with cleaning the affected gullies.

FM Conways’ work with CCTV footage is also helping discover pipes and gullies unknown to the council and from which the Greater London Authority is creating a comprehensive inventory. Cleansing teams do not know the condition of the pipe until they send in a push-rod camera. The footage reveals if repairs are needed. If a pipe is damaged the team pump in a liner, followed by a resin, which solidifies and creates a new lining which will last for up to 25 years. However, if a pipe has fully collapsed, no amount of lining will fix it and the pipe will require digging work.

For more information on companies in this article

Related Content

  • 12D for Christchurch
    June 12, 2012
    Australia's increasingly popular 12D Model software package for road design, terrain modelling, surveying and drainage has been selected as the main design and survey tool for the coordinated earthquake rebuild of Christchurch in New Zealand The 12D Model software will be the common platform for a group of consultants and contractors making up the recently formed SCIRT, standing for "Stronger Christchurch Infrastructure Rebuild Team". They will use it for survey, repair and rebuild of both the road netwo
  • A new tolled highway brings change for Austin, Texas
    February 10, 2020
    A new highway section in Austin, Texas marks a major departure for the southern US city
  • Climate change is damaging roads
    August 16, 2018
    With 2018 well under way, the ravages of extreme weather in recent months is now sadly apparent on the road network in many countries, and even on many continents. In East Africa, heavy rains have overwhelmed storm drains in many areas, with flood waters washing away vehicles and damaging road surfaces in urban and rural areas alike. Road repairs are now having to be carried out in Kenya, Rwanda, Tanzania and Uganda to patch up surfaces that have been washed away, along with the replacement of signage and
  • Lower traffic emissions in London
    May 20, 2019
    London’s ultra-low emission zone (ULEZ) system is already proving successful. In the first month since the scheme was introduced, the number of non-compliant vehicles entering the charging zone has been reduced by 9,400/day, a drop of 26%. According to the latest research, 74% of vehicles entering the ULEZ have been in compliance with the emission requirements.