Skip to main content

Lindsay moveable barrier system earns MASH approval in the US

Lindsay Transportation Solutions has announced that its QuickChange Moveable Barrier Concrete Reactive Tension System (QMB-CRTS) has earned MASH approval. The system meets crash test and evaluation criteria contained in the American Association of State Highway and Transportation Officials’ Manual for Assessing Safety Hardware (MASH). MASH is the new standard for the crash-testing of safety devices for use on the National Highway System. It updates and replaces NCHRP Report 350. “We are pleased to inform
May 14, 2018 Read time: 2 mins

2438 Lindsay Transportation Solutions has announced that its QuickChange Moveable Barrier Concrete Reactive Tension System (QMB-CRTS) has earned MASH approval.

The system meets crash test and evaluation criteria contained in the American Association of State Highway and Transportation Officials’ Manual for Assessing Safety Hardware (MASH).

MASH is the new standard for the crash-testing of safety devices for use on the National Highway System. It updates and replaces NCHRP Report 350.

“We are pleased to inform our existing customers that the NCHRP350 TL4 barrier they installed in recent years now has passed MASH TL3,” said Chris Sanders, senior vice president of Lindsay Transportation Solutions. “All CRTS barriers connect seamlessly, providing fully compatible systems and spare parts.”

The QMB-CRTS is a non-anchored, portable or temporary concrete barrier used in managed lanes and construction applications. The company said that it is the first and only MASH compliant moveable barrier system that uses a machine to create real-time roadway reconfiguration while maintaining positive barrier protections between lanes. The system completed two MASH Level 3 (TL3) crash tests conducted by an independent testing facility, which were submitted to the Federal Highway Administration for approval in December.

If installed under the range of tested conditions, QMB-CRTS is now eligible for reimbursement under the federal-aid highway programme.

Last October, Lindsay’s Road Zipper median barrier system won an award of merit from the San Francisco Metropolitan Transportation Commission for its performance on the Golden Gate Bridge. The moveable median barrier, completed in January 2015, has reduced head-on collisions on the 2.7km-long bridge that handles around 2.5 million vehicles per month.

The barrier is a mechanical “zipper” that changes the configuration of the bridge’s six lanes twice daily to keep traffic flowing smoothly.

For more information on companies in this article

Related Content

  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • IRF wins highly prestigious Prince Michael Road Safety Award
    March 28, 2018
    The International Road Federation (IRF Geneva & IRF India) has received the prestigious Prince Michael International Road Safety Award 2017 for its Enhanced First Aid Programme The prize was handed over to the IRF chairman, Kiran Kapila and Susanna Zammataro, IRF executive director at a special ceremony held at The Savoy in London on Tuesday 12th December in the presence of His Royal Highness, Prince Michael of Kent. Since 2015, IRF has undertaken several initiatives to strengthen ‘’pre-hospital’’ trauma
  • JMT and Parsons get a Nice Bridge contract in the US state of Maryland
    July 7, 2015
    In the US state of Maryland, a joint venture of Johnson, Mirmiran & Thompson (JMT) and Parsons Brinckerhoff has won a contract to replace the Harry W. Nice Memorial Bridge. The Maryland Transportation Authority awarded the $1 billion contract to replace the bridge, also known as the Potomac River Bridge and which was opened in 1940. The tolled 2.7km two-lane continuous truss bridge on US 301 spans the Potomac River between Newburg in Maryland and Dahlgren in the state of Virginia. Construction of the
  • Canada’s key temporary bridge ahead of time and lower cost
    October 2, 2014
    In Canada, a seven-lane temporary causeway bridge between downtown Montreal and Nuns' Island, initially scheduled to open by early 2015, has finished ahead of deadline and under budget. Initially, the cost of the key transport structure was estimated at US$111.89 million (CAD 125 million). The temporary bridge is being used by Montreal-bound vehicles initially, with the first users crossing on Monday (6 October 2014). A complete closure of the Champlain Bridge's all Montreal-bound lanes for two days was