Skip to main content

ACO’s Qmax Neo drainage for Costa Rica

Stormwater drainage by ACO is keeping dry some access roads for National Route 1, the Carretera Interamericana Norte (North Interamerican Road).
June 16, 2021 Read time: 2 mins
Effective drainage can be achieved using preformed sections that are set in concrete: all images courtesy of © ACO

The route is important and is the northern segment of the Pan-American Highway, which crosses Costa Rica and connects the Central American nations. The route runs through the casco central districts of capital San Jose, linking the city centre with San Jose International, Airport Tobias Bolanos.

In all 2,900m of the ACO Qmax Neo product have been installed on 10 access roads. The ACO Qmax Neo product has been installed on the inside curve to prevent flooding and vehicles aquaplaning during the seasonal four month period of heavy rainfall. The opposite road section drains into an open pitch. The F900 grating was chosen because the design meets the required intake area and the design can be integrated into road surface.

Contractor Pedregal Constructora installed the new Qmax 300 Neo products using concrete to form the structural support around the pre-formed units. The pavement beam feature allowed the positioning of reinforcement and also assisted the flow of concrete through the top part of the product during installation. This job was made easier through the use of an installation jig, which held the product in place.

The sections are placed in excavations, with concrete then being poured around
The sections are placed in excavations, with concrete then being poured around

The ACO DRAIN Qmax Neo is a new member of the ACO Qmax family which now includes the range of sizes of 150mm, 225mm, 300mm, 350mm up to the egg-shaped 550mm, 700mm and 900mm units. The larger sizes offer a substantial retetention volume and collected rainwater can be stored temporarily and then discharged into the sewers system in a controlled manner during heavy rainfall events.

Intergrated gaskets make the channel watertight in accordance with EN 1433. All sizes can be used with tailormade inlet shafts and inspection elements to suit the requirements of the project. For road sections without a camber, this can be delivered using special height adapters to achieve a slope within each channel section.

For more information please email [email protected]

Sponsored content produced in association with ACO Surface Water Management

For more information on companies in this article

Related Content

  • New tunnel linings from Trelleborg
    August 2, 2017
    Trelleborg has unveiled its innovative cast-in profile sealing system at the recent 2017 Rapid Excavation & Tunnelling Conference (RETC). The firm says that its latest cast-in profile sealing systems are designed to help ensure that tunnelling projects keep to project timescales and budgets. The design of the units also helps to shorten the production process of concrete tunnel gaskets according to the firm.
  • MB Crusher: Pushing attachment boundaries since 2001
    June 15, 2023
    For over 20 years, MB Crusher has offered a full line of innovative and patented jaw crusher and screener buckets and accessories for excavators, skid-steer loaders and backhoes of all sizes. Guy Woodford sat down with Alessia Valerio, MB's communications manager, at the recent 31st edition of SaMoTer in Verona to learn more about the company's latest developments and future growth plans
  • The ideal road construction machine
    November 1, 2023
    Opened in 1955, the A2 is one of the busiest motorways in Switzerland, crossing the Alps and forming the main north-south axis from Basel to Chiasso. On a 3km stretch near the village of Rodi in Ticino, a ZX155W-7 owned by Otto Scerri SA has been employed on a project to replace the central reservation with asphalt, as well as renew the drainage between the two lanes of the highway.
  • G&Z’s improved S600 slipformer
    February 18, 2020
    G&Z is now offering its successful S600 Paver, first introduced in 2010, with a new Tier 4 Final emissions compliant engine and enhanced width capability. The new S600 Power Unit was completely redesigned in 2019 and features: