Skip to main content

Testing and striping underway for Seattle’s Alaskan Way tunnel

Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems. The client, Washing State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways. STP said that testing could be complete by as early as late September and the tunnel could open as soon as this fall after an ap
August 31, 2018 Read time: 3 mins
Testing, testing: Seattle Tunnel Partners making sure that equipment and signage operates effectively in the soon-to-open Alaskan Way Tunnel in Seattle (photo courtesy WSDoT)
Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems.


The client, Washing State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways.

STP said that testing could be complete by as early as late September and the tunnel could open as soon as this fall after an approximate three-week viaduct closure to realign the  SR 99 – called the Alaskan Way - into the new tunnel.

The project is called the Alaskan Way Viaduct Replacement Project after the section of SR 99 in Seattle called the Alaskan Way, a street running along the seafront. Part of the Alaskan Way is an aging 3.2km viaduct – opened in 1953 - which is being replaced by the 2.7km tunnel almost directly beneath it. This will free up waterfront area for major inner city development (see World Highways, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 33214 0 link-external key project report false /categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>, November 2017).

The multi-layered tests of the tunnel's operational and safety systems includes pre-functional tests to ensure working of individual equipment such as a sprinkler head. Functional tests check that the equipment works together as a system, for example multiple sprinklers. Finally, integrated testing checks that multiple systems function together - heat detectors and video cameras operate with the fire suppression system.

Striping of the road decks inside the tunnel is also continuing. The stripes separate a deck into two 3.3m lanes, a 2.4m shoulder on the left side and a 0.6m buffer on the right.

Kiewit Infrastructure West has started traffic signal, striping and roadway signage work to switch traffic on Alaskan Way from under the viaduct to the west of it. The viaduct will eventually be demolished after the tunnel is opened likely this fall.


Tunnel boring was completed last year by Bertha, the world’s largest diameter earth pressure balance tunnel boring machine at the time, with a cutterhead diameter of 17.5m. By the end of last year it had been dismantled, job completed.

Seattle Tunnel Partners - a joint venture of New York-based 4761 Dragados US (a subsidiary of Dragados, the construction division of ACS Group of Spain) and the general contractor Tutor Perini Corporation, based in California.

Apart from designing and building the tunnel - and owning Bertha - STP is responsible for building highway ramps and other connections at the north and south ends of the tunnel. STP is also constructing permanent buildings at the north and south portal to house lighting, ventilation and other essential tunnel systems

For more information about the Alaskan Way Viaduct Replacement Program, see the website:

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.alaskanwayviaduct.org false http://www.alaskanwayviaduct.org/ false false%>

For more information on companies in this article

Related Content

  • ARTBA launching student video competition for 2015
    February 18, 2015
    The American Road & Transportation Builders Association (ARTBA) is running its annual student video competition. This is set up to challenge students of all ages to produce a two-to-four minute video about America’s transportation infrastructure. World Highways continues to support this competition and has also posted links to those videos from past winners and runners up on its websites in previous years. The ARTBA Student Video Competition is now in its fifth year. The aim of the competition is to raise a
  • Angry wife tells husband it’s over with a message on a freeway billboard
    October 9, 2015
    Billboards are used to advertise everything, from toothpaste to airplanes and also to get a message across, such as don’t litter the highway. But one wife in Sheffield, United Kingdom, decided to make it personal, and tell her cheating husband that it was all over.
  • Golden opportunity at AAPA 2015 International Flexible Pavements Conference
    August 19, 2015
    In just under four weeks, on Australia’s Gold Coast, the best minds in the global flexible pavement industry will gather for the Australian Asphalt Pavement Association’s 2015 International Flexible Pavements Conference. Experts will be presenting the most up-to-date technical information as well as real life examples of applied technology to projects, whether they be roads, tunnels, ports or airports. “This is a must-attend event for all in road construction and maintenance,” said Michael Caltabiano,
  • FRD produces Fx Series scaling breakers for tunnel construction
    January 6, 2017
    Furukawa Rock Drill (FRD) has developed the Fx Series of small hydraulic breakers with a scaling version for tunnel use. Using a mono-block cylinder with replaceable wear parts, the Fx Series breakers are said to provide increased power with reduced operating noise. There are four Fx models available with weights of 112-300kg, they are intended for excavators with operating weights of 1.5-7 tonnes.