Skip to main content

Strabag wins German A3 Autobahn contract

Austrian contract STRABAG has won the tender process to widen the A3 Autobahn in southern Germany. The contract will see the firm widening the A3 to six lanes in a deal worth €90 million. The A3 connects the cities of Frankfurt and Nuremburg. STRABAG has been awarded the EO 287 contract to widen a 5.7km section of the road using asphalt construction methods in the state of Bavaria. It has also won the EO 259 contract to widen an 8.5km section of road using asphalt construction methods in the state of in Bad
July 24, 2015 Read time: 2 mins

Austrian contract 945 STRABAG has won the tender process to widen the A3 Autobahn in southern Germany. The contract will see the firm widening the A3 to six lanes in a deal worth €90 million. The A3 connects the cities of Frankfurt and Nuremburg. STRABAG has been awarded the EO 287 contract to widen a 5.7km section of the road using asphalt construction methods in the state of Bavaria. It has also won the EO 259 contract to widen an 8.5km section of road using asphalt construction methods in the state of in Baden-Württemberg.

Contract section EO 287 will see STRABAG widening the A3 to six lanes from the Heidingsfeld interchange in Bavaria to Randersacker Bridge. In addition to widening the asphalt roadway, the contract also involves extensive retaining wall works as well as the construction of noise barriers. A temporary road will also be built south of the motorway in order to reduce the interruption to traffic to a minimum.

STRABAG also recently started work on the A3 contract section EO 259, a stretch of Autobahn near Wertheim in Baden-Württemberg. This contract involves the expansion of the asphalt roadway from four to six lanes.

For more information on companies in this article

Related Content

  • STRABAG’s German highway assets increased
    October 4, 2018
    STRABAG has increased its stake in the A8 motorway operator PANSUEVIA. This share has been boosted from 50% to 100%. PANSUEVIA operates the autobahn stretch that runs between Ulm and Augsburg in the south of the country. SRABAG purchased the 50% stake in PANSUEVIA that was previously held by HOCHTIEF. As a result, STRABAG is now the 100% owner of the concession company operating the Ulm–Augsburg section of the A8 autobahn. Both parties agreed not to disclose the purchase price however. This section of the
  • Czech highway deal for consortium partners
    February 5, 2019
    A consortium has won a package of works to construct a section of the D35 highway in the Czech Republic. The 12.6km stretch of the D35 highway lies between Opatovice and Časy and the project has a contract value of €132 million, with the work expected to take 44 months to complete. The consortium is headed by Austrian contractor STRABAG with a 41% stake in the deal and also includes the Czech firms Silnice and SMP CZ. This new four-lane link will feature two interchanges. The D35 is part of the northern
  • North Carolina contract for Lane
    October 6, 2021
    Lane Construction is to work on a major North Carolina contract.
  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b