Skip to main content

Strabag wins German A3 Autobahn contract

Austrian contract STRABAG has won the tender process to widen the A3 Autobahn in southern Germany. The contract will see the firm widening the A3 to six lanes in a deal worth €90 million. The A3 connects the cities of Frankfurt and Nuremburg. STRABAG has been awarded the EO 287 contract to widen a 5.7km section of the road using asphalt construction methods in the state of Bavaria. It has also won the EO 259 contract to widen an 8.5km section of road using asphalt construction methods in the state of in Bad
July 24, 2015 Read time: 2 mins

Austrian contract 945 STRABAG has won the tender process to widen the A3 Autobahn in southern Germany. The contract will see the firm widening the A3 to six lanes in a deal worth €90 million. The A3 connects the cities of Frankfurt and Nuremburg. STRABAG has been awarded the EO 287 contract to widen a 5.7km section of the road using asphalt construction methods in the state of Bavaria. It has also won the EO 259 contract to widen an 8.5km section of road using asphalt construction methods in the state of in Baden-Württemberg.

Contract section EO 287 will see STRABAG widening the A3 to six lanes from the Heidingsfeld interchange in Bavaria to Randersacker Bridge. In addition to widening the asphalt roadway, the contract also involves extensive retaining wall works as well as the construction of noise barriers. A temporary road will also be built south of the motorway in order to reduce the interruption to traffic to a minimum.

STRABAG also recently started work on the A3 contract section EO 259, a stretch of Autobahn near Wertheim in Baden-Württemberg. This contract involves the expansion of the asphalt roadway from four to six lanes.

For more information on companies in this article

Related Content

  • Financing model confirmed for German Autobahn
    June 27, 2016
    The refinancing package for Germany’s A8 Autobahn has now been formalised. The section of the A8 runs between Ulm and Augsburg in the south of Germany and is operated by concession firm Pansuevia, a 50:50 partnership between HOCHTIEF and STRABAG. The 58 km section of the A8 between Ulm and Augsburg was opened to traffic on schedule in September 2015 after four years of construction. PANSUEVIA designed, financed, and carried out the widening of the section to six lanes and took over maintenance and operation
  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.
  • Strabag leads consortium for planned Polish project
    July 24, 2014
    Austrian contractor Strabag will lead the consortium constructing a stretch of the S7 expressway in Poland. Strabag is teaming up with Heilit+Woerner for the project to build the Trasa Nowohucka section of the S7 linking Rybitwy and Igołomska and lying to the east of Kraków. Construction work is commencing in August/September 2014 and the contract is worth around €130 million. The consortium is handling the upgrading and construction work for some 18.6km of roads in all. The work includes widening a 4.5km l