Skip to main content

India mulls feasibility of bridge over Palk Straight to Sri Lanka

India will carry out a feasibility study on a road link between Rameswaram in Tamil Nadu state and Thalaimannar in Sri Lanka, a federal government minister has said. "It needs the consent of both countries,” said Union minister of state for road transport, highways and shipping, Pon Radhakrishnan. “The project needs to be discussed at various levels," according to a brief report by India’s Hindu newspaper. Radhakrishnan told the reporters that federal government had begun consultations to carry out a
October 27, 2015 Read time: 2 mins
India will carry out a feasibility study on a road link between Rameswaram in Tamil Nadu state and Thalaimannar in Sri Lanka, a federal government minister has said.
 
"It needs the consent of both countries,” said Union minister of state for road transport, highways and shipping, Pon Radhakrishnan. “The project needs to be discussed at various levels," according to a brief report by India’s Hindu newspaper.

Radhakrishnan told the reporters that federal government had begun consultations to carry out a feasibility study on various possibilities.

Palk Strait is named after Robert Palk, a British governor of Madras Presidency during the 18th century.

The strait connects the Bay of Bengal in the northeast with Palk Bay and the Gulf of Mannar in the southwest. However, at its narrowest point, it is studded with a 30km chain of low islands and reef shoals collectively called Adam's Bridge. One of the Indian islands, Rameswaram, is linked to the mainland by the 2km Pamban Road Bridge that opened in 1988. It runs parallel to the much older Pamban Rail Bridge, which was built in 1914.

In June, Mumbai-based dna newspaper reported that a proposal for providing road and rail link bridging the divide across Palk Strait had been submitted to the Asian Development Bank, for a pre-feasibility study and subsequent financing.

A “makeshift ferry service” now connects the two closest points. Union minister for road transport and highways at the time, Nitin Gadkari, said the link could be a combination of bridge and sea tunnel, dna reported.

Related Content

  • New study suggests Fehmarn Belt payback close to 50 years
    October 9, 2015
    A study by Danish consultant Hans Schjær-Jacobsen has shown that the payback period for the proposed Fehmarn Belt Fixed Link tunnel project between Denmark and Germany will be close to 50 years. This is a decade longer than estimated by the developers of the project which focusses on a 17km immersed tunnel, the study noted. The Fehmarn Belt Fixed Link will connect the German island of Fehmarn with the Danish island of Lolland. The 17km tunnel, including two railway tunnels, two motorway tunnels and an
  • Growth for Intertraffic India 2013
    February 28, 2013
    The organisers of Intertraffic India 2013 expect substantial growth both in exhibitors and attendees over the previous event, held in 2011. Intertraffic India was launched in 2011 with 85 exhibitors, of which 60% were international firms and the show attracted 3,000 visitors. But with strong growth in India’s infrastructure sector, higher exhibitor and attendee levels are predicted for 2013. The event will be further boosted by its link with the IRF through its Regional Conference, which is being run in par
  • New bridge link for Sri Lanka
    January 10, 2017
    A new bridge spanning Sri Lanka’s Mahaweli River and close to the city of Kandy has been officially opened. The bridge link connects the neighbouring villages of Dodanwala and Halloluwa in Sri Lanka’s Central Province and was opened by Maithripala Sirisena, the country’s president. The bridge is nearly 105m long and replaces a 75 year old suspension bridge that was no longer fit for purpose. The old structure carried pedestrian traffic only while the new bridge carries two lanes of vehicle traffic, as well
  • Further delays expected for the Fehmarn Belt Fixed Link
    August 26, 2015
    Further delays to the planned Fehmarn Belt Fixed Link between Germany and Denmark appear likely because of objections to the project during the planning stages, Danish media reported. Government authorities in the German state of Schleswig-Holstein indicated that permission for the project, which focusses on a 17km immersed road and rail tunnel, will probably be given in 2017, and not next year as previously believed. German authorities have received about 3,100 objections to the project that has rise