Skip to main content

Contracts awarded for key sections of Poland’s S7 route

Work is starting on Poland’s S7 expressway. Italian firm Salini Impregilo is leading a consortium to construct a 21.5km stretch of the S7 expressway. The section lies between the Jedrzejow and Checiny junctions. The deal is worth nearly €144.67 million. The completion deadline is set for the third quarter of 2017. Meanwhile a consortium headed by Budimex has won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 route between Ostroda Polnoc and Ostroda Poludnie. The wo
June 18, 2015 Read time: 1 min
Work is starting on Poland’s S7 expressway. Italian firm 7809 Salini Impregilo is leading a consortium to construct a 21.5km stretch of the S7 expressway. The section lies between the Jedrzejow and Checiny junctions. The deal is worth nearly €144.67 million. The completion deadline is set for the third quarter of 2017. Meanwhile a consortium headed by 3302 Budimex has won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 route between Ostroda Polnoc and Ostroda Poludnie. The work will also include the construction of an 8.7km ring road around Ostroda which will be part of the national road number 15 (DK 15). Completion of the work is expected to take 20 months in all, excluding the downtime for the winter months.

For more information on companies in this article

Related Content

  • Major Polish highway projects being planned
    October 12, 2015
    Work on a series of major road projects is now gathering pace. The Polish General Directorate for National Roads and Motorways (GDDKiA) is signing contracts worth over €753.55 mIllion for the construction of two S7 dual carriageway sections. These will form part of the Gdansk-Warsaw route. Czech firm Metrostav will build the 20km section between Koszwaly and Nowy Dwor Gdanski. And Budimex will construct the 19km section between Nowy Dwor Gdanski and Kazimierzowo.
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • Consortium signs contract for section of S5 expressway in Poland
    August 8, 2014
    A consortium consisting of Heilit+Woerner (a subsidiary of Austrian company Strabag) and Budimex, has signed the contract to build a section of the S5 expressway between Poznań and Wrocław, Poland, with a gross value of about €138 million.
  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.