Skip to main content

Contracts awarded for key sections of Poland’s S7 route

Work is starting on Poland’s S7 expressway. Italian firm Salini Impregilo is leading a consortium to construct a 21.5km stretch of the S7 expressway. The section lies between the Jedrzejow and Checiny junctions. The deal is worth nearly €144.67 million. The completion deadline is set for the third quarter of 2017. Meanwhile a consortium headed by Budimex has won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 route between Ostroda Polnoc and Ostroda Poludnie. The wo
June 18, 2015 Read time: 1 min
Work is starting on Poland’s S7 expressway. Italian firm 7809 Salini Impregilo is leading a consortium to construct a 21.5km stretch of the S7 expressway. The section lies between the Jedrzejow and Checiny junctions. The deal is worth nearly €144.67 million. The completion deadline is set for the third quarter of 2017. Meanwhile a consortium headed by 3302 Budimex has won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 route between Ostroda Polnoc and Ostroda Poludnie. The work will also include the construction of an 8.7km ring road around Ostroda which will be part of the national road number 15 (DK 15). Completion of the work is expected to take 20 months in all, excluding the downtime for the winter months.

For more information on companies in this article

Related Content

  • Slovakia tunnel excavation complete
    September 21, 2018
    Excavation work on Slovakia’s Visnove Tunnel has now been completed. Driving the tunnel took nine months longer than originally anticipated. The 7.5km tunnel will be Europe’s seventh longest when complete and forms part of the D1 highway between Dubna Skala and Lietavska. Work on this highway started in 2014, with the construction being carried out jointly by Italian contractor Salini Impregilo and local firm Duha. Fitting out of the tunnel is now commencing, with equipment such as ventilation and traffic
  • Czech tenders for D6 section near Karlovy Vary
    June 7, 2023
    The Petrohrad-Lubenec section includes several bridges with work starting by the end of the year for completion in 2026.
  • UK widening contract awarded to
    September 21, 2015
    A joint venture formed of Balfour Beatty and Carillion has won the tender process for a €401 million (£292 million) road widening package in the UK. The joint venture will commence with preparatory works worth €686,680 (£500,000) initially as the main contract is subject to approval of the wider A14 improvement scheme. The aim of the joint venture’s work is to upgrade the A14 between Swavesey and Milton. This forms part of the wider A14 Cambridge to Huntingdon road improvement scheme. The joint venture is a
  • Poland: Ministry decides to build missing section of A1 motorway
    October 24, 2016
    The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million. Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction. The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020. Earlier this year, Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km betwe