Skip to main content

Kentucky’s 1931 Ledbetter road Bridge comes to an explosive end

Specialist demolition contractors working for the Kentucky Transportation Cabinet have successfully brought down one truss span of the Old Ledbetter Bridge near Paducah. The bridge has been taking traffic across the Mississippi River since 1931. Boat traffic on the Tennessee River was halted for about 90 minutes by the U.S. Coast Guard. KYTC said there were several audible warning signals, then a countdown, followed by a flash and puff of smoke from the explosive charges. As sound of the explosion echoed a
October 1, 2014 Read time: 2 mins
Specialist demolition contractors working for the Kentucky Transportation Cabinet have successfully brought down one truss span of the Old Ledbetter Bridge near Paducah. The bridge has been taking traffic across the Mississippi River since 1931.

Boat traffic on the Tennessee River was halted for about 90 minutes by the U.S. Coast Guard. KYTC said there were several audible warning signals, then a countdown, followed by a flash and puff of smoke from the explosive charges. As sound of the explosion echoed along the river banks, KYTC said the steel truss dropped into about 30 feet (10m) of water below the bridge.

Once an all-clear was issued, river traffic was allowed to resume and a crane was moved in to start pulling steel from the river. The constractor believes it should take about 48 hours to remove the steel and place it on barges to be hauled to a scrap yard.

See it happen on the video below, which was forwarded to World Highways by Demolition News website:

Related Content

  • Award winning bridge for North Carolina
    November 21, 2019
    A new bridge in the US state of North Carolina has won a key award for excellence – Mike Woof writes
  • Work on St Petersburg bridge project
    June 20, 2016
    Contractor ICA Construction used two Aquajet robotic hydrodemolition machines at the top of a 120m-high bridge pylon located in the city of St Petersburg. The two Aquajet robotic water cutters were used to remove surplus concrete from around the inner steel structure of the bridge pylon. This link spans the River Neva and forms part of the Western High-Speed Diameter (WHSD) route in St Petersburg. The WHSD is a highly important route for the region and will provide a key connection between the Scandinavi
  • Atlas Copco attachments make short work of the A8 Blaubeurer Weg Bridge
    March 21, 2016
    A reinforced concrete bridge over the Autobahn 8 between Merklingen and Nellingen in southern Germany was demolished overnight due in no small part to the efficient, reliable performance of Atlas Copco hydraulic attachments. In addition to demolition grippers, breakers and pulverisers, the demolition team used the HM 2000 hydraulic magnet to demolish structures and sort demolition waste. There is now nothing to stop the widening of the A8 to six lanes or construction of the parallel high-speed Wendlingen
  • Romania’s important bridge project
    October 5, 2022
    Romania’s important Braila Bridge project will deliver a key crossing spanning the Danube River