Skip to main content

Key Quebec bridge connection resurfacing contract

A new road surface is required for the Ile-d'Orleans Bridge in Quebec, Canada. The resurfacing work is needed just four years after the surfacing works were completed. The problem is caused by a combination of the tough winter weather and the age of the bridge, which requires the asphalt to be laid in a much thinner layer than on more recent structures. The thin layer of asphalt is vulnerable to cracking and damage and this has resulted in rapid wear due to the freeze thaw effect. The maintenance work is ex
August 15, 2014 Read time: 1 min

A new road surface is required for the Ile-d'Orleans Bridge in Quebec, Canada. The resurfacing work is needed just four years after the surfacing works were completed. The problem is caused by a combination of the tough winter weather and the age of the bridge, which requires the asphalt to be laid in a much thinner layer than on more recent structures. The thin layer of asphalt is vulnerable to cracking and damage and this has resulted in rapid wear due to the freeze thaw effect. The maintenance work is expected to cost US$378,000 (C$415,000).

Related Content

  • Unique cost saving asphalt repair system
    February 15, 2012
    Winter repairs The tough winter conditions in Canada play havoc with road conditions and this often results in problems such as potholes and longitudinal cracking. But Aquadyne Industries says it has found a solution with the introduction of infrared asphalt restoration equipment. The equipment from Ray-Tech Infrared can be used all year round to repair roads and is now carrying out valuable work in Canada due to the firm's local agent, Aquadyne Industries. These units offer an alternative to the traditiona
  • Seal of approval
    August 2, 2012
    Timely maintenance using proven cost-effective methods can extend the life of a highway by many years as Patrick smith reports Highways are expensive assets to construct, and the wear and tear of modern traffic means that regular maintenance will delay costly repairs or in extreme cases reconstruction. There are a number of methods of carrying out such maintenance, and these include the use of slurry seals and micro-surfacing, which are cold mixed asphalt which is a mixture of graded aggregate, asphalt emul
  • Harsh winter weather impacts on road surfaces
    February 27, 2012
    With warmer weather now spreading across the Northern Hemisphere, the impact of a second successive harsh winter can finally be seen on the roads of many nations. The transport links of many countries were affected badly by tough winter conditions. From the US to Russia and the 27 European Union members, heavy snow blocked roads and led to endless delays.
  • Bitumen technology reduces maintenance costs
    April 12, 2023
    Looming net zero deadlines, and impetus from the private sector are accelerating the take up of carbon-saving technologies